Laserfiche WebLink
QUARTERLY SAE INSPECTION REPORT <br />Identification <br />During Inspection: <br />.mate Water Level <br />nt (% total storage) <br />(cfsj <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />Comments <br />Required; <br />Permit Reference <br />of Inspector: Dave Jenkel <br />Lodestar Ener ,Inc. puarter: <br />Mun er Can on Mine C-81-020 Inspection <br />2' Snow D D See D <br />0% 0% 0% Comments 0% <br />0 0 0 0 <br />No <br />No No No No <br />No No No Na <br />No <br />No <br />SAE-4 -Topsoil is no longer required. See Volume V, Appendix M(viii)-4 <br />Vegetation is adequate to control erosion. <br />The operator was unable to repace SAE-1 embankment with a rock check <br />dam and silt fence because the area was to wet after DM; a~Qraovoal <br />of the revision. e~~0 RET~~s <br />_ s~Opr\a~ cu°ja.rl0 <br />Volume V, Appendix M (viii), & Volume II Figure?i:`~J_F,~~ ` ''%~•+~9r„A <br />f* <br />a <br />P. E. <br />e <br />