Laserfiche WebLink
~~ <br /> <br />4. Labor <br />• 32 hrs @ $14.00/hr $ 448.00 <br />+40$ overhead S 179.20 <br />$ 627.20 <br />Sub Total $ 2,481.40 <br />D. Spreading Mulch @ 4,000#/Acre <br />1. 4,000# mulch per acre @ $150.00 <br />x 14.5 acres $ 2,175.00 <br />2. 1 Truck @ $3.20/hr x 32 hrs $ 102.40 <br />1 Tractor @ $8.00 x 32 hrs ,$ 256.00 <br />$ 358.40 <br />3. Labor <br />64 hrs @ $14.00/hr $ 896.00 <br />+40$ overhead S 358.40 <br />$ 1,254.40 <br />Sub Total $ 3,787.80 <br />T~~tal Cost of I $11,477.92 <br />• II. Major Disturbance Area (32.9 Acres) <br />A. Grade pit bottom and sideslopes <br />1. Equipment <br />1 Bulldozer @ $20.82/hr x 120 hrs $ 2,498.40 <br />1 Grader @ $24.21/hr x 120 hrs $ 2,905.20 <br />1 Pickup @ $3.20/hr x 120 hrs S 384.00 <br />$ 5,787.60 <br />2. Labor <br />240 hrs @ $14.00/hr $ 3,360.00 <br />+40$ overhead S 1.344.00 <br />$ 4,704.00 <br />Sub Total $10,491.60 <br />B. Respread Stockpiled Topsoil <br />1. Equipment <br />1 30-cubic yard earth scraper @ <br />$50.00/hr x 100 hrs $ 5,000.00 <br />1 Grader @ $24.21/hr x 100 hrs $ 2,421.00 <br />1 Pickup @ $3.20/hr x 100 hrs S 320.00 <br />. $ 7,741.00 <br />