Laserfiche WebLink
<br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: L.v/1/z~ /( P„(cl~~t Date: / - z 6 - 93 <br /> <br />Pond Number: to Date Last Inspection: /Q - z G- 9 2 <br /> <br />Site Name: e/1ya # / Quarter; F~nrt /59~ <br /> <br />1. Design Depth Measured From Spillway Invert B,O <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Invert 2.q o <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert /. 8 t <br /> <br />4. Water Level Measured From Spillway Invert ~,o-y,,,,42 <br /> <br />5. Discharge Through Spillway Since Last Inspection _ Yes X No <br />6. Ri]ls and Gullies Yes X No <br />7. Vegetation Adequate X Yes No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows Yes k No <br />10. Cracks Yes X No <br />11. Seepage _ Yes ~ No <br />12. Spillway Clogged _ Yes ~ No <br />13. Valves Operational X Yes No <br />ADDITIONAL COMMENTS: tea.,,,/ (~(pgiy~,,,t I', <br />MAINTENANCE REQUIRED: ~ ~r,.w e ~~i NiN; <br />- - ¢ F - <br />WW ik ~ <br />-3v ~~ <br /> SPI[[WAY INV! <br />-~-- <br />Z ~ 2 ~ Q Z <br /> <br />W W j W Q <br />W <br />~ ~ h v R ~1 <br />