Laserfiche WebLink
~„r„\\ • • <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LgRl1~ ,ref c ~ /re Date: J - 1 6 93 <br />Pond Number: q Date Last Inspection: /o-26 92 <br />Site Name: C~rrieo ~,~ad Quarter: Fi~r~ /99s <br />1. Design Depth Measured From Spillway Invert /.0 s' <br />2. Design Maximum Sediment Level Measured From Spillway Invert l,oo <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 2•~ <br />4. Water Level Measured From Spillway Invert iyo,v, <br />5. Discharge Through Spillway Since Last Inspection Yes X No <br />6. Rills and Gullies _ Yes ~Y No <br />7. Vegetation Adequate X Yes No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows Yes X No <br />10. Cracks Yes ~ No <br />11. Seepage _ Yes X No <br />12. Spillway Clogged _ Yes ~' No <br />13. Valves Operational ~ Yes No <br />ADDITIONAL COMMENTS: ,voti< <br />MAINTENANCE REQUIRED: ,vu.~{. <br />- - 4 ~ - <br />W ~ ~ ~ ~ <br />3 ~ ~~ <br />SPILLWAY SNV~ <br />-~--- <br />? ~ 2 ~ z <br />h o ~ n ~ n <br />W <br />`O h v ~ A f1 <br />