Laserfiche WebLink
Gage Rod Reading (Maximum): <br />Gage Rod Reading (Today, Approximate <br />Water Level): There is no gage rod. <br />Measure the depth to water from the top <br />of the primary spillway riser and subtract <br />from 8222.3, or, estimate by comparison to <br />toe of upstream face at 8216. <br />Waterlevel (feet below emergency <br />spillway): Subtract observed elevation <br />from 8224.1. <br />Estimated Height of Dam: <br />Estimated Freeboard (emergency spillway <br />to top of dam): <br />Sediment Level (% of total storage): Use <br />the following scale to estimate the % of <br />total storage: <br />To the bottom of the riser ............. 100% <br />6" below the bottom of the riser ...... 50% <br />To elevation 8216 ..................... 10% <br />At elevation 8215.6 ................... 0% <br />(t7% 24 Oct iitspectiart) <br />Outflow (cubic feet per second): <br />Photographs: <br />Photograph # 1: pa,., <br />Photograph # 2: o~,,, <br />Photograph # 3: ,~,,,SS ~,.~d i° do-•Y. <br />Not applicable. There is no gage rod <br />installed. <br />(u G~~+.a v'~n cf..ti 1 to a C/ <br />CGV f ~ ~c~ <br />8 feet to the invert of the emergency <br />spillway <br />1.5 feet <br />(0% last inspection) f-+r.~../ <br />CUVrYf~ <br />SP~r' ~~~ `U`` <br />/D <br />Azimuth: N O <br />Azimuth: iyr yS ° ~ <br />Azimuth: /~ ~z j-~ <br />Pond 002, Page 2 of 5 <br />