My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27291
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:39 PM
Creation date
11/20/2007 7:50:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Hydrology
Doc Date
6/19/1998
Doc Name
FINAL PERMIT COLORADO WASTEWATER DISCHARGE PERTMIT SYSTEM NO CO-850001 FORMERLY CO-0036561 NATIONAL
From
CDOH
To
CARYL R HELMIN
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COLORADO DEPARTMENT OF HEALTH <br />4Taxer Quality Control Division <br />4210 East 11th Avenue <br />Denver, Colorado 80220 <br />CERTIFICATION <br />COAL MINING GENERAL PERMIT <br />NATIONAL KING COAL, INC. <br />KING COAL MINE <br />PERMIT N0. COG-850001 (formerly CO-0036561) <br />LA PLATA COUNTY <br />I. TYPE OF PERMIT: Industrial (General: Coal Mining surface <br />runoff only) <br />II. FACILITY INFORMATION: <br />A. Facility Type: Category 07, Subcategory 5-General Permits <br />Coal Mining - Surface Runoff Only <br />Fee Category: Current fee $360/yr per GRS 25 8-502. <br />B. SIC Code: 1222 (Bituminous Coal Underground Mining) <br />C. Location: In the NE 1/4 of Sec 31, and NW 1/4 of Sec <br />32, T35N, R11W, approximately 4 miles <br />southwest of Hesperus, CO. <br />D. Legal and <br />Facility Contact: Caryl R. Helmin <br />Business Manager <br />National King Coal, INC. <br />1015 1/2 Main Avenue <br />P.0. Box 2905 <br />Durango, CO 81302 <br />(303) 259-2146 <br />E. Discharge Point: 001 and 002 - the discharge from <br />sedimentation ponds which collect surface <br />runoff from the area surrounding the mine. <br />F. Facility Design <br />Capacity: The Ponds are designed to contain the 10- <br />year, 24-hour precipitation event. <br />
The URL can be used to link to this page
Your browser does not support the video tag.