Laserfiche WebLink
• • <br />Reclamation Cost Estimate Summary <br />R & R Regester Enterprises, Inc. <br />Antero Gravel <br />File No. M-2000-088 <br />November 21, 2000 <br />Task No. 1 Grade 440 I. ft. of highwall, depth of mining equals 70 ft. D8-Dozer 3,818.00 <br />Task No. 2 Grade pit floor and perimeter slope - 9 ac. D8-Dozer 1,678.00 <br />Task No. 3 Place 6" topsoil on ]0 ac. (cell A) scraper 621E 7,276.00 <br />Task No. 4 Revegetate -seed and application, fertilizer and application, <br />tillage, mulch and application 10,676.00 <br />Task No. 5 Mobilize/Demobilize dozer, scraper, fann tractor and implements 800.00 <br />Total Direct Reclamation Costs 24,248.00 <br />Indirect costs - 18.5% of Direct 4,485.88 <br />Total Direct & Indirect Costs 28,733.88 <br />Administrative Fee (5%) Rule 4.2.1(5) 1,436.69 <br />TOTAL 31,607.26 <br />FINANCIAL WARRANTY AMOUNT 31,600.00 <br />M:\oss\ahdUdo reclamation cov eshma~eM-?000-I 14.doc <br />