Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: L,e,e~t~ 7_ /q _ q <br />~0. /ler c~kc Date: ~ 2 <br /> _ <br />Pond Number: 2 Date Last Inspection: 9-/G•92 <br /> <br />Site Name:___ Utz- J'.wf/. ~ Quarter: Tani J992 <br /> <br />1. Design Depth Measured From Spillway Invert U, ?/ <br /> _ <br />2. Design Maximum Sediment Le vel Measured From Spillway Invert 0.2 ? <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 3.2 2 <br /> <br />4. Water Level Measured From Spillway Invert ,yovc. <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes Y No <br />6. Ri 11 s and Gullies Yes X No <br />7. Vegetation Adequate ?Yes _ No <br />8. Outlet Channel Erosion Yes )' No <br />9. Animal Burrows Yes ~ No <br />10. Cracks Yes Y No <br />11. Seepage _ Yes ~ No <br />12. Spillway Clogged - Yes X No <br />13. Valves Operational /1/A . _ Yes _ No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: ~icw.C <br />T <br />--~~-¢ O~ <br />3 v <br />V .•~J r <br /> <br />-~,--- - <br /> ~ <br />Y ~ 0 M <br /> ~ <br />W a, W y w <br />r O b v q _ Q <br />