Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4,05.9(17) <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: None <br />Inspection Period: Second Quarter2DD7 <br />Inspection Date: 0627/07 <br />General Description or Reference fA Site Plan: <br />Pond 6 is anon-discharging facility designed to contain pint processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater ocher ponds prior to clean-out. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate Few <br />Extensive Some / rew t <br />Poor <br />None <br />_ No_~ <br />No v~ <br />Yes <br />4). Erosion of the downstream tce of the embankment? Yes <br />Cause of erosion can be attributed to: <br />5). Is seepage oaxrrring through the dam? Yes <br />Could this seepage quse potential instability/? <br />_ No (~- <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacdy of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />/~7/0`~ <br />Date ~- <br />No ~/' <br />MSHA Qualified Impoundment 1 tspector <br />