Laserfiche WebLink
Michelle L. Hatcher Page4 <br />8/13/2007 <br />the values listed in Table 3, an amendment will need to be filed with this <br />office. <br />3. All water discharged from the Stagecoach Stop pit and utilized to offset <br />depletions caused by the pft operation cannot be banked or credited to offset <br />lagged depletions in subsequent years. All discharges v~ill be available to <br />offset depletions in the year when depletions are actually; occurring. <br />4. All pumping for dust control and dewatering discharges to the South Platte <br />river shall be measured in a manner acceptable to the division engineer. <br />5. The dewatering rate and quantity shown in Appendix D <br />meter records for the dewatering become available the , <br />the data used to compute monthly lagged depletions an <br />dewatering. If at any time the projected stream depletic <br />is unable to replace all out-of-priority stream depletions, <br />notify the division engineer and water commissioner of t <br />and describe how consumptive use at the site will be rec <br />replacements will be increased to ensure all out-of-priori <br />replaced. <br />6. The Water Commissioner responsible for the adminisl <br />Robert Stahl, 9378 WCR 25, Fort Lupton, CO 80621, <br />0742. The applicant shall maintain daily records of all <br />replacements, and the amount of water used for each <br />applicant shall provide a report of these records to the <br />the water commissioner on a monthly basis on a form <br />accounting must be submitted within five (5) calendar <br />month for which the accounting is being made. <br />In addition, the applicant shall submit a report from each <br />replacements; for this plan, that entity is the City of Auro <br />include an accounting of all wastewater plant water efflu <br />each entity, showing the total volume of water under its c <br />wastewater treatment plants, and the amount committed <br />recipients of the water. <br />7. All releases of replacement water must be sufficient to c <br />depletions and be made under the direction and/or appn <br />Commissioner(s). The replacement may be aggregated <br />beneficial use. The Water Commissioner(s) andlor Divi: <br />determine the rate and timing of an aggregated release. <br />8. The Applicant shall follow the recharge protocol as <br />document for the operation of this SWSP. <br />9. The replacement water, which is the subject of this plan c <br />leased to any other entity. As a condition of subsequent r <br />substitute water supply plan, the replacement water must <br />this site until a plan for augmentation is obtained. A copy <br />letter should be recorded with the county clerk and record <br />estimated. As <br />~plicant shall update <br />replacements from <br />s show the Applicant <br />ie Applicant shall <br />>',projected shortfall <br />ced and/or <br />depletions will be <br />h of this plan is Mr. <br />ie no. (303) 857- <br />~ular purpose. The <br />ion engineer and <br />wed by them. The <br />of the end of the <br />itity making <br />The report shall <br />t controlled by <br />itrol at the various <br />'each of the <br />• all out of priority <br />of the Water <br />Engineer shall <br />in the attached <br />inot be sold or <br />iewals of this <br />appurtenant to <br />this approval <br />. All replacement <br />