Drilling and Completion Report Groundwater Monitoring Well AM2
From
AmerAlia Inc.
To
DMG
Permit Index Doc Type
Other Ground Water
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AmerAlia, Inc. AM2 Drilling and Completion Report <br />Table 1. Well-History Data for AmerAlia AM2 <br />Top (ft) Bot (ft) Start Date End Date Remarks <br />0 48 28Jan-00 28-Jan-00 Drilled 7 7/8-inch hole from surface to 48 ft in alluvial <br /> sediments. Moisture noticed at about 37 ft. Ground water <br /> intersected at about 48 ft; estimated at 20 gpm. <br />48 90 29-Jan-00 29-Jan-00 Drilled 7 7/8-inch hole from 48 to 82 ft (TD) in alluvial <br /> sediments, and from 82 to 90 ft in fractured bedrock of the <br /> Uinta Formation. <br />90 90 29-Jan-00 29-Jan-00 Completion of well: Added foam to drilling fluid to clean out <br /> hole. Ran 40 ft of 4 1/2-inch schedule 80 PVC pipe and 40 ft <br /> of slotted (10/20) PVC to bottom (84 ft); screened interval <br /> from 44 to 84 ft. Attempted to back-fill around PVC casing <br /> with pea gravel and sand. Completion was difficult because <br /> the hole was washed out at 48 ft, which consumed all of the <br /> gravel (3,000 fb) and sand on site. Shut down operations to <br /> bring in more materials. <br />90 90 31-Jan-00 31-Jan-00 Continued completion of well: Truck-load (10 yards) of pea <br /> gravel delivered to site. Packing of PVC annulus was <br /> completed as follows: pea gravel (23-90 ft); 10-20 sand (18- <br /> 23 ft); bentonite pellets (13-18 ft); Portland cement (0-13 ft). <br /> Cleaned out debris, foam, and mud from hole. Attempted to <br /> obtain water sample (05:40 to 17:40 hours). Attempt <br /> unsuccessful due to lack of drill crew. Checked out well <br /> head, pit, and discharge. Well completion materials included <br /> 35 bags of cement, 8 bags of bentonite grout, and 12 bags of <br /> silica sand. <br />Daub & Associates, Inc. <br />