Laserfiche WebLink
I. GENERAL TERMS AND CONDITIONS: <br />A. INITIAL APPROVAL: <br />1. This permit is issued in reliance uoon'the accuracy and completeness <br />of infor-catien supplied by the applicant, and is conditioned aeon <br />construction, installation, and operation in accordance with iris <br />infor-nation and 'with representations made by the applicant or its <br />agents. <br />2. This permit is valid only for the equipment and/or operations <br />specifically identified herein. <br />3. Each and every condition of this permit is a material part hereof <br />and is not severable. Any challenge to, or appeal of, a condition <br />hereof shall constitute a rejection of the entire permit and upon <br />such occurrence this permit shall 6e deemed denied ab initio. <br />4. This permit may be denied or revoked by the Division for grounds <br />set forth in the Colorado .air Pollution Control Act and permit <br />.regulations, including failure to meet any express term or condition <br />imposed therein upon or after final approval. <br />5. This permit must be retained and made available far inspection coon <br />request at the location set forth heroin, and shall not be transferred <br />without approval of the Division. <br />B. FINAL APPROVAL: <br />1. This Emission Permit does not provide "final" authority far oceration <br />of this source, within the meaning of C.R.S. 1913, 2C-7-112(=)(h), <br />until final approval is granted by the Division in writing. Final <br />approval cannot be granted until construe*_ion is completed and operation <br />• and construction have been verified by the Division as conforming in all <br />respects with the conditions of this permit. <br />2. Before issuing final approval of this permit the Division reserves the <br />riaht.to impose additional terms and conditions required to ,EEL appli- <br />cable regulations of the Cormissien and Federal and state ambient air <br />standards on a continuing basis. Monitoring and testing requirements <br />may also he imposed. <br />3. Failure of this source tp obtain final approval within six (6) months <br />of initial operation, as tha*_ term is defined by the Division, will he <br />deemed a denial of the original appiicatien for emission permit and <br />shall be treated as a denial by the Division. <br />• <br />