Laserfiche WebLink
~, <br />E},1IIBIT L <br />ESTI4fATcD COST OF RECLAItATION <br />As stated earlier in this application, this project will be operated <br />with a 20 acre floating bond with disturbances of: <br />a. Major disturbance - 10 acres <br />b. F!oderate disturbance - 5 acres <br />c. I.inor disturbance - 5 acres <br />Total 20 acres <br />Costs are projected as follows: <br />10 Acres Major Disturbance <br />Backsloping - continuing part of extraction <br />Stripping 12" X l0A X 5.25/cy (16,130 cy) <br />5 Acres I~foderate Disturbance <br />Topsoilin~ - 9 to 1S", average 12" <br />12" X SA X $.25/cy (3065 cy) <br />5 Acres FSinor Disturbance <br />P.eseeding and seed costs <br />Seed 7.45,:' PLS/A 5: 2. 90/lb. X SA <br />Planting 7.50/A X SA <br />Total P.eclamation Cost <br />20 acres/Floating Bond - <br />10 acres Pfajor Disturbance $4,032.50 <br />5 acres Itoderate Disturbance 2,O1G.25 <br />5 acres Minor Disturbance 145.55 <br />Total $6,194.30 <br />?7o Charge <br />$4,032.50 <br />2,016.25 <br />108.05 <br />37.50 <br />~^C ~~ 1. <br />il-``~_ ,. <br />JAN •~,g 19131 <br />r. ,~~^; <br />..I ,.. J:. ~. - .. . ..i ., <br />V~.~ <br />