Laserfiche WebLink
Page z a 3 <br /> Project: Elk Creek Mine Hole: ECP-2 <br /> <br /> From To Thick. Description <br />• <br /> 0.00 8.00 8.00 Road Fill: sand/shale/gravel, light brown-yellow, caving <br /> . at top <br /> 8.00 22.00 14.00 Clay: light gray-yellow, silty, 10°~ hard sandstone <br /> boulders <br /> 22.00 35.00 13.00 Clay: I'ght brown-gray, shaley, firth <br /> 35.00 37.00 2.00 Sandstone: light brown ray, shaley, fine, boulder <br /> 37.00 42.00 5.00 Clay. gray-broom, shaley, 10% sandstone boulders <br /> 42.00 44.00 2.00 Sandstone: light gray, fine grained, hard, boulder <br /> 44.00 48.00 4.00 Clay: gray-brown, shaley, 1096 sandstone boulders <br /> 48.00 50.00 ~ 2.00 Sandstone: light gray, fine grained, hard, boulder <br /> 50.00 55.00 5.00 Clay. gray-brown, shaley • <br />• 55.00 57.00 2.00 Sandstone: light yellow-brown, fine grained, hard, boulder <br /> 57.00 59.00 2.00 Clay: gray-brown, shaley <br /> 59.00 60.00 1.00 Sandstone: light yellow, fine grained, hard, boulder <br /> 60.00 62.00 2.00 Clay: gray-brown, shaley <br /> 62.00 63.00 1.00 Shale: dark gray, fine <br /> 63.00 63.00 TD Dry Hole <br /> Hole completed as H2O Monitoring Well <br /> OD of hole: 4.5" <br /> OD of pipe: 2-3/8" PVC Sch 80 flush joint <br /> ID of pipe: 2" <br /> Completion Data: <br /> 3 - 0' 2" PVC Riser Pipe (stickup) <br /> 0 - 50' 2" PVC Riser Pipe <br /> 50.60' 2" PVC Well Screen (0.010") <br />• <br />