Laserfiche WebLink
11. Waver Balann: Attach a line drawing showrrtg the water Pow through the facility. Indicak sources of intake wake, operations mnfribuling <br />wastewakr b the el0ucnt, snd frcafinenf units labckd to correspond b the more detailed descriptions in item Ig. ConaWcl a wake balance on the <br />line drawing by showing average flows 6etwcen intak«, operations, Ir«Imenf uniLS, snd outfells. Ua wstcr bslnncc «nnol be dclrnnincd, <br />provide s picbrisl description of the nature end smount of any sources of water end any collection or Ir«Imcnt mcasur«. <br />~2. Sire-specific conditions: ~rO ae C°"~'F'`~`T~lp~l7`~~~S~L <br />a) Does Ihia facility have bulk storage of diesel fuel, gasoline, solvents, fertilizers, or other hazardous materiels on sikl ^ No ICFY« 4A S <br />b) is this operation located within one mile of a landfill, or any mine or mill tailings? ®No <br />~~j dewakring ar« have or possibly have groundwakr conlaminslion, such as plumes from I«king underground storage tanks, ek.7 <br />IK) NoIJ Y« <br />ICS for aoy of Ihex, please show location of the landfill, failings or possible groundwakr wntaminsGon on the to«tion msp in item 9 or in the <br />general akekh in item 10. Pleex ezplsin the to«Gon, extent of conlaminetion, poisibk etl2ct on the discharg« from Ihu fuilily. <br />13. Chemical htahnent: Will sny Oocculants (sef0ing agents or chemical eddifiv«) be used b heal water prior to discherge9 <br />m No ^ Y« If Yom, list here snd include the Material Sefcry Data Shcef (MSDS) with dre application. <br />Chemical Name • Manufacturer Pu In Which Waste Stream? <br />• Udre elrnriiul formulae vrrlnorrn a emfidmua[ pwide (he mu~uficnrdr wne rnnlacr penal ad6er and plwne num6a or r copy of the nwuGclurtlr buhuy poducr <br />4bd nformaeon a rrutnida hulling dan ahccr a uch praducr uu4 1'karC M 1're rrujor Cqualarna a active irgrcdimgak if YrgNrl <br />14. Uacd or manufactured to:ia: The applicant must provide s list of any toxic products which the applicant currently us« or manufactuta u en <br />i~nte1tmcdiale or final product or by product. <br />fir O ti, <br />I i. Fluty mersuremenf: What method of Ilow mcdsurcment will be usul for «ch dischsrge point (e.g., v notch weir, pump.capacity, panhdl Ilume, <br />etc.)T Dcsignak whether currently installed or proposed. Identify the minimum end maximum Ilow meesurcmcnt upebdity. <br />-r~oTCH WEIK-- <br />I6. 4nptsrvemenb: Please provide a deuription of sny ebekmenl rcquircrncnf, abelcmenl projxl end projected final complimcc dsles if subjcel b <br />any prc~enl rcquircmcrtts or wmplience schedul« for conaWClion, upgrading or operation of wask tr«tmcnl equipment. Also include here s <br />descnphon of sny changes b the (sciliry since the previous permit renewal. <br />Nurse <br />