Laserfiche WebLink
CIRCES Cost Estimatina Software <br />Task # : <br />004 <br />Date: <br />04/022007 <br />User: <br />JHB <br />State : Colorado Permitrjob#:X2001-228-00 <br />County :Garfield Abbreviation : none <br />Site : Valley Book Cliffs Coe Filename :X -00-004 <br />Agency or organization name : <br />Division Of Reclamation, Mining And Safety <br />Permit or other job action : <br />Task description: <br />REgrade access roads <br />HOURL EQUI . C I OS4 <br />Basic machine <br />: Cat D7R DS Series 11- 7SU <br />Horsepower: <br />240 <br />Blade type <br />Semi-Universal <br />Attachment no. 1 <br />: ROPS Cab <br />Shift basis: <br />1 per day <br />Attachment no. 2 <br />:3-shank ripper <br />Data source <br />(CRG) <br />Utilization % <br />Cost Breakdown i <br />Ownership costthour: <br />$47.67 <br />NA <br />Operating costlhour: <br />$54.13 <br />100 <br />Ripper op. cost/houir: <br />$0.43 <br />10 <br />Operator cost/hour <br />$32.78 <br />NA <br />Total unit costlhour: <br />$135.01 Total fleet cost/hour: <br />$135.01 <br />77777777777 <br />MATERIAL TIES <br />Initial <br />Swell <br />Loose <br />volume: 3,891 <br />LCY factor <br />NA volume: <br />3,891 <br />LCY <br />Source of estimated volume :App. Table 1 <br />x I ft. depth <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Job Conditio Correction Fa ctors <br />Source <br />Operator skill <br />0.75 <br />(avg.) <br />Average push distance: <br />50 feet <br />Material consistency: <br />1.20 <br />(Cat HB) <br />Unadjusted hourly production : <br />1,022.9 LCY/hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description <br />Job efficiency: <br />0.83 <br />(Ishiftlday) <br />Loose stockpile <br />Spoil pile: <br />0. <br />_(ffid-rt) <br />Push gradient : <br />1.02 <br />(Cat HB) <br />Average push gradient: <br />1.00 % (neg) <br />Altitude: <br />1.00 <br />(Cat HB) <br />Average site attitude <br />6,800 feet <br />Material weight: <br />0.87 <br />(Cat HB) <br />Blade type: <br />1.00 <br />(S/SU/U) <br />Material weight: <br />2,650 Ibs/LCY <br />Net correction <br />0.53 <br />Weight description: <br />Decomposed rock - 25% Rock, 75% Earth <br />Adjusted unit production 542.42 LCYthr <br />Adjusted fleet production $42.42 LCY/hr <br />JOB TIME AND COST <br />Fleet size 1 Dozer(s) Total job time 7.17 Hours <br />Unit cost : $0.249 ILCY Total job cost $968 <br />