Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT <br />IDENTIFICATION <br />Task # : <br />002 <br />Date: <br />0410212007 <br />User: <br />JHB <br />State : Colorado <br />County : Garfield <br />Site : Grand Valley Book Cliffs <br />PerFnitrjob#:X2007-228-00 <br />Abbreviation :none <br />Filename :X-00-W2 <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />Permit or other job action : NOI <br />Task description: Regrade 16 drill pads <br />HDIJIiLY EQUIPMENT COST <br />Basic machine: <br />Cat 07R DS Series l/ <br />Slade type: <br />Semi-Universal <br />Attachment no. 1 <br />: ROPS Cab <br />Attachment no. 2:3-shank <br />ripper <br />Shift basis : 1 per day <br />7SU Horsepower: 240 <br />Data source <br />(CRG) <br />Utilization % <br />Cost Breakdown <br />Ownership cost/hour <br />$47.67 <br />NA <br />Operating costlhour: <br />$54.13 <br />100 <br />Ripper op. cost/hour: <br />$0.86 <br />20 <br />Operator costlhour: <br />$32.78 <br />NA <br />Total unit cost/hour: $13544 Total fleet cost/hour: <br />$135.44 <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 6,582 <br />LCY factor <br />NA volume: <br />6,582 <br />LCY <br />Source of estimated volume App. Table 11 <br />X 1,5 <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance: <br />50 feet <br />Material consistency: <br />1.20 <br />(Cat HB) <br />Unadjusted hourly production : <br />1,022.9 LCY/hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description: <br />Job efficiency : <br />0.83 <br />(Ishiffiday) <br />Loose stockpile <br />Spoil pile: <br />0.80 <br />(fnd-rf) <br />Push gradient: <br />0.97 <br />(Cat HB) <br />Average push gradient: <br />2.00 % (pos) <br />Altitude: <br />100 <br />(Cat HB) <br />Average site altitude <br />6,800 feet <br />Material weight: <br />0.87 <br />(Cat HB) <br />- UAJ) <br />Blade type: <br />too <br />(SIS <br />Material weight: <br />2,650 lbstLCY <br />Net correction <br />0-50 <br />Weight description: , <br />Decomposed rock - 25% Rock, 75% Earth <br />Adjusted unit production <br />514.18 <br />LCY/hr <br />Adjusted fleet production: <br />514.18 <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size <br />I Dozer(s) <br />Total job time: <br />12.80 <br />Hours <br />Unit cost <br />$0.263 /LCY <br />Total job cost <br />$1,734 <br />7SU Horsepower: 240 <br />