Laserfiche WebLink
R EQ UIPMENT <br />Machine <br />Description <br />Total <br />Cost[hour/unit <br />Fleet Size Haul Trip <br />(No. units) CosVhrtfleet <br />sh eet 2 of 2 <br />Return Trip <br />Cost/hr/fleet <br />-REEDRILL SK35, 9.0 in. <br />$198.69 <br />1 <br />$198.69 <br />$198.69 <br />Zjht Duty 4x4, I T <br />Crew <br />$37.90 <br />2 <br />$75.79 <br />$75.79 <br />- Flatbed Truck, OZ 15K G VW <br />$63.61 <br />1 <br />$63.61 <br />$63.61 <br />-Fuel Tanker, 4x2, 170 HP <br />$64.11 <br />1 <br />$64.11 <br />$64.11 <br />-Luba Truck, 4x2, 170 HP <br />$72.01 <br />1 <br />$72.01 <br />$72.01 <br />Subtotals:! $474.22 <br />...... . .... <br />EQUIPMENT DISTANCE and TIME' <br />Nearest major city or town within project area region <br />Transportation Cycle Time Nor- Total one-way travel distance: <br />Roadable Roadable Average travel speed <br />Equipment Equipment <br />Haul time (hours) = 0.56 0.56 Total non-roadable mob/demob cost <br />Return time (hours) = 0.56 0.56 1 two round trips with haul rig <br />Loading time (hours) a 0.50 NA Total roadable mob /demob cost ":— <br />Unloading time (hours) = 0. NA one round trip, no haul rig <br />Subtotals = 2.11 1.11 <br />j4 <br />Grand Junction <br />25.0 miles <br />45.0 mph <br />$1,710.51 <br />$526.91 <br />JOB TIME AND COST Total job time : 4.22 hours <br />Total iob cost: 52.237 <br />