My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62779
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:04 PM
Creation date
11/20/2007 7:42:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Permit File
Doc Date
3/29/2002
Doc Name
ARVADA RESERVOIR COVER SHEET GENERAL NOTES
Section_Exhibit Name
COVER SHEETS GENERAL NOTES
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
""loss poe slejam <br />W la eolsln10 <br />W 6 Z 8nw <br />C13A1333,V <br />'. t. �' .� f • ff Rl <br />GEryrEFTA.L CVa7EG <br />1. The Contractor is responsible for preparing a sequencing plan for all fill placement for accept- <br />ance by the Engineer. No contiguous vertical joints between fill sections are allowed. The <br />minimum horizontal stagger length between joints is 100 feet. The parameters for allowing <br />joints and staggered fill sections in the embankment are sbpes no more than 4:1 for con- <br />necting fills and no difference in height of 5 feet between fill sections are allowed. All <br />joints between fill sections shall be connected together with clean fresh material. An existing <br />fill section shall be cut down to fresh material, scarified and moistened to allow a tight <br />interface with new fill. <br />2. The topsoil on the entire site shall be stripped and stockpiled for later use. No material shall <br />be placed in any portion of the embankment until the foundation for each section has been <br />dewatered stripped.- ...1carified and _ compacted, and has been approved by the contracting <br />authority. Refer to Fulton Lakes Pit Des- 'ar3!!!P.enert for foundation requirements. <br />3. Clay fill material in interior dike shall have a minimpercent of clay fines passing the <br />United States Standard No. 200 sieve of no less than 5 by dry weight and shall have a <br />plasticity index of 10 percent or greater for the portion of material passing a United States <br />Standard No. 40 sieve. Cobbles and rock fragments havitg maximum dimensions of more <br />than 6 inches shall not be placed in clay earthfill. Please refer to Fulton Lakes Pit Design <br />Report "Embankment Specifiations and Testing Requirements" for details. <br />4. Random fill material shall consist of a reasonably well - graded pervious mixture of fines, sand, <br />gravel, and cobbles. No cobbles and boulders larger than 6 inches in maximum dimensions <br />may be embedded in the fill and must be removed from the fill prior to placement. <br />5. All reservoir liner fill shall be compacted to a minimum of 95% ASTM- D698 -78 Standard <br />Proctor Density at 1% below to 2% above optimum moistur3 content. Materials not meeting <br />the specified moisture content will be scarified and recompacted until material meets specifi- <br />cations. No frozen material is allowed to be used as fill. <br />6. Each lift of fill will be put in at a maximum of 9 inch loose lifts. Each lift of fill shall be <br />scarified to allow proper bonding between lifts, <br />7. All Zone 1 material in interior dike embankment shall consist of processed clay shale from the <br />reservoir bottom that is broken down into a uniform plastic clay. Air slaking and prewetting <br />of the clay shale material is recommended prior to placing nto the embankment. All Zone 1 <br />material shall be compacted to 95% of ASTM D- 698 -78 Staidard Proctor Density at 1% below <br />to 2% above optimum moisture. Any non - uniform lifts or lifts improperly tied to preceding <br />lifts will be removed, reprocessed and recompacted to speciications. <br />8. All Zone 2 material in the interior dike embankment shal consist of overburden materials <br />similar to those used in the liner embankment. All Zone 2 material shall be compacted to <br />95% of ASTM D- 698 -78 Standard Proctor Density at 1% belav to 2% above optimum moisture. <br />Any non - uniform lifts or lifts improperly tied to preceding ifts will be removed, reprocessed <br />and recompacted to specifications. <br />9. The vertical lift difference between Zone 1 and 2 materials stall be no more than 2 feet dur- <br />ing construction. Please refer to the Fulton Lakes Pit Design Report for placement specifications. <br />10. All bedrock shall be covered between shifts, or every 12 hours, with a minimum of two lifts. <br />11. A mimimum of one test per every 1000 cubic yards of naterial compacted in place or a <br />minimum of 3 tests per lift, whichever is more. <br />12. The owner will provide quality control testing during the project. The contractor will be <br />responsible for notifying the quality control engineer forty eight (48) hours in advance of <br />required testing. <br />13. The owner will not be liable for any delays caused by the Contractor not providing adequate <br />notice to the quality control engineer. <br />14. An 815 or equivalent sheepsfoot roller shall be used fo, compacting efforts. A gang -disk <br />or equivalent equipment shall be used for scarification betireen embankment lifts. Compactive <br />effort is only one part of the standards for embankment construction. Process is important <br />to achieve interlocked lifts with no stratified layers of dry and wet material. <br />15. Horizontal and vertical control by Epp & Associates, Inc. Project benchmark located as noted <br />on grading plan. <br />16. If the Contractor finds any conflicts in this set of plans or is unclear about the construction <br />procedure, the design engineer shall be notified immediately, and clarification requested, in <br />writing. <br />CCC�s�[��JC <br />tQ� <br />C -F —C: I.: [::�E <br />,5 - , � 1:H <br />11qED F11 I E <br />t._ <br />L= <br />F r r r I T_ a [_Y� <br />F � 1GF <br />fik D <br />7 R' 2 Ri R; F\ _F G - Ci 7 Wf <br />CCLC��r� �CL_C�lzD G <br />Qct;afser �fTCT'[ <br />f Vi,. <br />%o <br />I <br />i <br />/ <br />AV E. rs' <br />li ` L• <br />f ,ry <br />I _ell, ri <br />� •l'� � t ' i �,i � % Ilnxeltine <br />' 9 s,T <br />Pdr <br />a <br />i w�l: yi r ali Hazeltine l ru <br />y� 1......_ C�.I1e1 htn :4`a <br />52 l' <br />t, <br />I z i i <br />T2 S. <br />h <br />18 Rio ti I � � __ n i I ! �' i,• i <br />' {soar <br />Mdy�e_ Honig - D <br />sr � . Sq+.9ge ]rc ;ttn6m {; ! .'�,.. // •:. � <br />.57 it <br />r <br />• �� <br />tot, <br />anus; <br />� <br />S� <br />` 1 <br />1 <br />1 ;e <br />R . SS <br />/ Ir _ wuns ! <br />el <br />Pat <br />I � <br />I i ri <br />J. <br />/. ^I' rv,d.. �a •step �' % c � . <br />r Vj; <br />1ASE IL <br />J/ <br />h• - r <br />V[C[CV[l Y/ C I C <br />SCALE: 1" = 2000' <br />2000Ieao 1100 800 400 0 500 1000 2000 <br />REVISIONS <br />No. Date By Chk'd <br />1 I 3/26/02 CJC KES I C11r CoMMU <br />t u ' <br />a a• ." y F <br />4 <br />GINNER: Aggregate Industries <br />3605 S. Taller St. <br />Lakewood, CO 80235 <br />Town Maul <br />(3013) 716 -5224 <br />ENGINE- RI: Applegate Group, Inc. <br />1499 West 1 20th Ave. <br />Suite 200 <br />Denver, CO 90234 <br />Mike Applegate, P.E. <br />(303) 452-6611 <br />SURVEYOR: Epp £r Associates, Inc. <br />433 4th Ave. West <br />P.C. Box 837 <br />Craig, CO 81628 <br />Deter Epp, L.S. <br />(970) 824-8236 <br />GI ECTECHNICA,.L/ <br />SOIL INVESTIGATION: CTL/Thompsor>n, Inc. <br />1971 W. 12th Ave. <br />Denver, CO 80204 <br />Marc Cleveland, P.E. <br />(303) 825 -0777 <br />copy <br />GREED [C1IGENC <br />1. Cover Sheet, General Notes <br />2. Property Boundary <br />3. FfOOdpfain, Ff OOdway <br />4. Slurry Wall As -Bu ft <br />5. Grading Plan RECEIVED <br />5. Cross Sections MA,R z 9 20 <br />7. Details Division of Minerals and Geology <br />I hereby certify that these plans for construction of Arvada <br />Gravel Pit Reservoir Liner were prepared by me or under <br />my direct supervision for Aggregate Industries. IF YOU DIG COLORADO -- CALL US FIRSTI <br />;oo REC %sit UTILITIES NOTIFICATION CENTER <br />ymber or <br />0�4� •��HAE( 9q� c� � � a��j <br />'J 15791 P: Class: Permit 1 <br />Secao /Exhibit G �'+ an CU <br />w ------ - - - - -- C x�z -Legit- Qe�ca1 - pfa�._._, 11 r <br />Charles Michael Apple ��e T;�e /D Revision <br />e'q es 7 <br />PP g I'll ff ••......•: r - �f (111034-, r ` �. lea Dever) <br />Colorado Professional Engineer No. 15791 �4iS /0 k% poi °rt Type: ° Re, Hydro °gene a -- - - - - -- - - - -- - - <br />r f' <br />CALL 2 BUSINESS DAYS PRIOR TO <br />OAppiicatlon (Coal only) ° R&M -15 E "` °memo "' °'nspec " °" - EXCAVATION FOR UTILITY LOCATIONS <br />-�>rm " --�• IIIIIlIIIIlII�l�llllllllll <br />008880 <br />i" 1351 - <br />LIT <br />L� <br />' s <br />r =1 <br />__J <br />> <br />10/26/01 <br />U) <br />L- <br />D"wlt: <br />A a� ao t i9 <br />� <br />go <br />of 0 <br />CMA <br />1 Scale: <br />AS SHOWN <br />� <br />�� <br />C <br />J w O <br />V <br />Z <br />iW <br />E <br />O� <br />r <br />to <br />L. <br />• <br />Q <br />�V <br />40 <br />� <br />N <br />a <br />[� <br />.7 <br />S <br />t�S <br />V1 <br />0 <br />rn <br />u <br />a o li <br />V <br />� <br />O O ry <br />�0 7 @i <br />�'-.. <br />O <br />yUNrn <br />"81 ^' <br />a <br />w' M <br />O\ <br />i" 1351 - <br />LIT <br />L� <br />' s <br />r =1 <br />__J <br />> <br />10/26/01 <br />U) <br />01 -121 <br />D"wlt: <br />IP- <br />� <br />UPPIO <br />Checked: <br />CMA <br />1 Scale: <br />AS SHOWN <br />� <br />�� <br />Z <br />iW <br />O� <br />VLU <br />MAR 2 9 2002 <br />Date: <br />10/26/01 <br />Job No: <br />01 -121 <br />D"wlt: <br />CJC <br />Design: <br />KES <br />Checked: <br />CMA <br />1 Scale: <br />AS SHOWN <br />Sheet <br />(1F <br />1 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.