My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27189
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:33 PM
Creation date
11/20/2007 7:41:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Hydrology
Doc Date
8/10/1981
Doc Name
AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. 1lonitoring Requirements (Continued) <br />~~trl; ; „t.; co-0035653 <br />The analytical method selected fur a parameter should be the one Chat <br />can measure the lo~.~esC detection limit for thaC parameter, unless the <br />Slate Standard i5 ~~~ithin the [es~t-ing range of another approved method. <br />Any parameters [hat demonstrate instream levels in excess of [I~~ose found <br />in Tables I, II III of "Regulations Establishing Basic Standards And An <br />Antidegration Standard And Establishing A System For Classifying State <br />llo to rs, For Assigning Standards and For Granting Temporary hlodi fica Cion" <br />ur appropriate Federal BPT standards may require additional rr~oni[oring as <br />directed by the lJater Quality Control Division. The additional monitoriny <br />e~i 11 take place on a quarterly basis for a one year period. Parameters <br />that remain in excess of the table values listed above may be required Co <br />meet instream limits and [he permit may be modified to incorporate <br />!hose parameters as effluent limitations. <br />(©) For mine water or drainage from an open pit or underground <br />mine, a sample must be analyzed from each discharge point. <br />(C) For surface runoff controls, if [here are several iti[h <br />discharges, i[ is not necessary to sample the discharge from <br />each facility, provided [hat those sampled will be representa- <br />tive of Che various discharges. The minimum number of discharyes <br />sampled should be the greater of Che following: two discharges, <br />or 104 of [hc Colnl number of discharges. <br />1 <br /> <br />5/81 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.