Laserfiche WebLink
Mountain Coal Company Exhibit 69 <br />West Elk Mine Sylvester Gulch Facilities <br />~- reclamation, the road will be reclaimed to a light-use road, and will follow the new <br />alignment and not the alignment that exists currently. The substation access road will also <br />remain upon final reclamation, but reduced to a tight-use road, similar to the current road <br />in this azea. All other roads (including the Electric Borehole road) will be reclaimed upon <br />final reclamation. <br />The retention of roads within the Sylvester Gulch area meets the post-mining land use of <br />grazing and wildlife habitat. Only pre-existing roads (previous to mining) will be retained <br />to allow public access to federal lands. <br />Post-mining contours and cross-sections of the reclamation in comparison to pre-mine and <br />post-construction contours can be found on Map 58A and 59A, respectively. All other <br />information in regazds to reclamation (i.e., topsoil, seeding, planting methods, noxious <br />weed control plan, etc.) can be found in Section 2.05.4 of the Mining and Reclamation <br />Plan in Volume 1 of MCC's permit as it also applies to the Sylvester Gulch Facilities Area. <br /> <br />• <br />15 Nov. 1996 PR07R; Revised May 1997MR116; <br />Revi aed Ju 1. 1997 MR219 <br />