Laserfiche WebLink
RECLAMATION COST SUIYURY con['d sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Lost (f) <br />Subtotal (K): <br />____________ <br />L. DRILL ROLE/MONITORI MG WELL SEALING <br />Task No.~ Task Descri ptian ~ Cost (f) <br />Subtotal (L): <br />M. MISCELLANEQIS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (f) <br />___.~.I__________________~~_____._.._________.________I~__._._.___ <br />4 ~ Demolition <br />4 ~ Seeding .9 acres ~ 5634 <br />Fencing <br />5 ~ Mob/Demob 1 dS dozer or front end loader ~ f500 <br />Subtotal (M): f1, 734 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): f3, 130 <br />!I. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (f) <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ S49 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ f31 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 5313 <br />4. ~ Job Superintendent.. <br />Subtotal (A): 5392 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 b P): (3,522 <br />B. DNG PROJECT ADMINI STRATTON E%PENSES <br />Item No.~ Item Description ~ Cost (f) <br />1. ~ Minerals Program Admin. Fee at S.OOX of cntr.~ f176 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): f176 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B); f568 <br />TOTAL PERFORIANCE BOND AMOUNT (direct plus indirect costs); f3,698 <br />