Laserfiche WebLink
• <br />• <br />• <br />~/- zoo2 - oo ~/ <br />a~~ Rena/u lGl`'~i <br />7-/0- o.L <br />Red Rock Plant and Limestone Mine M-2002-004 7/10102 8:12 <br /> <br />Assumptions: SupersWCture Demolitbn: 8 0.147 CIRCES program for on-site demolition. 10,000 foot haul <br /> <br /> $ 2.65 Accept GCC value see attachetl note <br /> <br /> <br />Description Material Quantity Units $/Unit Extension <br /> <br />Overland Limestone Conveyor Superstmcbre 41904 C( $ 0.147 $ 6,159.89 <br />25,000 T Limestone Storge snperstrucwre 2292712 Cf $ 0.147 $ 337,028.66 <br />25,000T LS Irnerror Structure SucersWdure 42521 Cf $ 0.147 $ 6,250.59 <br />25,000 T LS Storage UndergmmM Vault concrete 4127 cf $ 2.65 $ 10,936.55 <br />Concrete Fbor Concrete 303 d $ 2.65 $ 802.95 <br />2500TSantlstone superstructure 484293 Ct $ 0.147 $ 71,191.07 <br />Concrete Fbor Concrete 14630 Cf $ 2.65 $ 38,769.50 <br />Coal Receiving Hopper Sucersliucture 28083 cf $ 0.147 $ 4,128.20 <br />Coal Receiving Hopper Untlegrountl Vault Concrete 1221 cf $ 2.65 $ 3,235.65 <br />Coal and Raw Materials Conveyor Superstructure 16171 Cf $ 0.147 $ 2,377.14 <br />Raw Material Stacker Superstructure 15768 cf $ 0.147 $ 2,317.90 <br />Raw Material Reclaim Superstructure 19992 Cf $ 0.147 $ 2,938.82 <br />Coal Ben pt sucerstructure 40128 cf $ 0.147 $ 5,898.82 <br />Coal Beu rig sucerstrocture 41143 cf $ 0.147 $ 6,048.02 <br />Raw Feed Blns SupersWCture 419328 c( $ 0.147 $ 61,641.22 <br />Raw Feetl Bin Concrete Fbor Concrete 1672 cf $ 2.65 $ 4,430.80 <br />Raw Mix Ben Conveyor sucerstructure 15360 Cf $ 0.147 $ 2,257.92 <br />Raw Grintling Superstructure 358520 Cf $ 0.147 $ 52,702.44 <br />Raw Grintling Concrete Fbor Concrete 2872 Cf $ 2.65 $ 7,610.80 <br />Raw Gdntling Recycle Conveyor Superstntclure 14784 Cf $ 0.147 $ 2,173.25 <br />elendingand Kiln Feed sucersbucmre 409829 cf $ 0.147 $ 60,244.86 <br />Blending and Kiln Feed Concrete Floor Concrete 3324 Df $ 2.85 $ 8,808.60 <br />Main Stack Superstructure 181951 Ct $ 0.147 $ 26,746.80 <br />Main Stack Concrete Footing Concrete 571 Cf $ 2.65 $ 1,513.15 <br />Preheater8ro«er Superswdure 1434495 cf $ 0.147 $ 210,870.77 <br />Prehealerg Tower concrete ncvr concrete 22054 Cf $ 2.65 $ 58,443.10 <br />Raw Mill Main 6agMasa sacerswctare 91622 cf $ 0.147 $ 13.497.63 <br />Raw Mill Main Baghouse Concrete Fkxx Concrete 1162 Cf $ 2.65 $ 3,079.30 <br />Kiln Superstructure 365269 Cf $ 0.147 $ 53,694.54 <br />Kiln Concrete Footings Concrete 14553 cf $ 2.65 $ 38,565.45 <br />Coal Grinding Superstructure 251319 Cf $ 0.147 $ 36,943.89 <br />Coal Grinding Concrete Fbor Concrete 1974 Cf $ 2.65 $ 5,231.10 <br />Clinker Cooler Superswcture 527308 cf $ 0.147 $ 77,514.28 <br />Clinker Cooler Concrete Fbor Corcrete 5120 cf $ 2.65 $ 13,568.00 <br />Clinker Vent Superstructure 177788 4 $ 0.147 $ 26,134.84 <br />Clinker Vent Concrete Flppt Concrete 3129 cf $ 2.65 $ 8,291.85 <br />Bucket Conveyor#t Superstructure 13464 cf $ 0.147 $ 1,979.21 <br />t00,000Clinker Sib Superstructure 1684463 cf $ 0.147 $ 247,616.06 <br />Tunnel Concrete 37447 cf $ 2.65 $ 99,234.55 <br />562TUnbumt Clinker Sib Superstructure 1527 C( $ 0.147 $ 224.47 <br />562 T Unbumt Clinker Sib Concrete Flpor Concrete 113 Cf $ 2.65 $ 299.45 <br />Bucket Conveyor tt2 SucerstrucWre 17652 cf $ 0.147 $ 2,594.64 <br />Gypsum Receiving Hopper and Conveyor Supershucture 10655 cf $ 0.147 $ 1,566.29 <br />Underground Vault Concrete 12140 cf $ 2.65 $ 32,171.00 <br />3,000 T Gypsum Storage and Conveyor fiucerswcture 49013 Cf $ 0.147 $ 7,204.91 <br />Undergmund Vault Concrete 15599 d $ 2.65 $ 41,337.35 <br />Ginker and GyFSUm Bucket Elevator SupersVUdure 416937 Cf $ 0.147 $ 61,289.74 <br />Fbor concrete 2938 cf $ 2.65 $ 7,785.70 <br />Finish Mill Feed Bins and Cement Grinding Superstructure 655373 Cf $ 0.147 $ 96,339.83 <br />Fbor concrete 7431 cf $ 2.65 $ 19,692.15 <br />Air Slide Conveyor Sucerswcture 18432 cf $ 0.147 $ 2,709.50 <br />10,000 T Cement Store a and Bucket EI SucersWCture 484611 cf $ 0.147 $ 71,237.82 <br />Fbor Concrete 2290 Cf $ 2.65 $ 6,068.50 <br />Truck and Rail Loadout Superstructure 85882 Cf $ 0.147 $ 12,624.65 <br />Fbor Concrete 1369 cf $ 2.65 $ 3,627.65 <br />Raw Recycle Bin Superstructure 187278 cf $ 0.147 $ 27,529.87 <br />Fbor Concrete 1280 d $ 2.65 $ 3,392.00 <br />LS Feed irensfer Point 8 Gammametric Sucerswcture 39537 Cf $ 0.147 $ 5,811.94 <br />Fbor Concrete 541 Cf $ 2.65 $ 1,433.65 <br />once Cgnstrunbn SucerstmcWre 300775 Cf $ 0.147 $ 44,213.93 <br />