Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Bowie Resources LLC Quarter: <br />Bowie No. 2 Mine - C-96-083 Inspection <br />Identification <br />of Pond <br />s During Inspection: <br />~ximate Water Level <br />lent (% total storage) <br />iw (cfs) <br />Rills 8 Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />Structural <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br />(Appurtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />(Additional Comments <br />mance Required: <br />of Inspector: Jim Stovar <br />E <br />., <br />ff <br />.~ <br />I First 2005 II <br />B C D -Gob Pile F -New Gob J UTL East K UTL West <br />Sediment Sediment Sediment Sediment Sediment Sediment <br />7' 6' 4' 1' D Damp Pools Mudd <br />25% 50% 10% 0% 0% 10% <br />0 0 0 0 0 0 <br /> <br />Problem Problem Problem Problem Problem Problem <br />Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No <br /> <br />No No No No No No <br />No No No Yes No No <br />No No No No No No <br />No No No No No No <br />No No No No No No <br /> <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />No No No No No No <br /> <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />The water in Ponds B, C 8 D was above the level of the primary spillway. <br />Pond B was being dewatered, the sediment in pond C was being removed. <br />Design depth measured from pond bottom to invert of emergency spillway: <br />Pond 8=10, C=10, D=7.7, J=6, K=4, F=10' TD g®°~aR ~ ~ ~Sje <br /> <br /> <br />Keep ponds dewatered. Remove sediment from pond C. e <br />~ <br />°oee++ <br />0 O4Pe?° F. ~l,~~+9Fa; <br /> 0~ oe.~ ~+ <br />ae: • ~ <br />0 V ~o°72 ~'y{(~~ <br />e ~r F/ ~f-~J ~42.1~ <br />