My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62521
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:53 PM
Creation date
11/20/2007 7:35:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Final Engineering Calculations
Section_Exhibit Name
4.0 Appendix 4-B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />_~ <br />R~r~i~lF~ ,5 <br />T-1 AND T-2 SPILLWAYS OCT 0 2 1995 5/6 <br />Since there is a ditch above the ponc~,s ~.]lat diverts all <br />surface flow away from t~s;blRT~d~~~a+~ e~,~ k flow that <br />T-1 and T-2 will need to andle is the 70 gpm flow from the <br />long pond or the decant flow from the 25-year event. The long <br />pond has the capacity to decant from one 6-inch pipe at 177 qpm <br />and two four inch pipes at 64 gpm each or 128 gpm. Design the <br />open channel for 305 gpm + 10% = 336 gpm (0.75 cfs) <br />OPEN CHANNEL SPILLWAY BETWEEN T-1 AND T-2 PONDS <br />FLOW IN A TRIANGULAR CHANNEL <br />• <br />DEPTH D 0.550 FEET <br />SLOPE S 0.010 EXPRESS AS DECIMAL <br />Mannings "N" N 0.030 EXPRESS AS DECIMAL <br />SIDE SLOPE X 1.500 SLOPE = X:1 <br />AREA=(W*D)+(X*D^2)= 0.45 FEET^2 <br />WETTED PERIMETER=(W)+2((XD^2+D^2))^.5 1.98 FEET <br />R=AREA/WETTED PERMITER 0.23 <br />V=(1.49/N)*(R^.667)*(S^.5)= 1.86 FEET/SEC <br />Q = A X V = 0.84 CFS <br />Q REQUIRED 336 GPM = 0.75 CFS 0.75 <br />The spillway will be a triangular channel 0.55 feet deep <br />with 1.5h:1v side slopes. With a freeboard of 1.0' the <br />required depth of the spillway is 1.55 feet. The flow velocity <br />slow enough that erosion will not be a problem. <br />SPILLWAYS BETWEEN T-2 AND OUTFACE 001 <br />DISCHARGE THOUGH A SUBMERGED TUBE <br />DIAMETER OF PIPE <br />AREA OF PIPE <br />C = LOSS COEFFICIENT <br />H = HEAD ON SPILLWAY <br />Q = C A (2GH)^.5 <br />Q = <br />Q = ONE 4-INCH PIPE _ <br />Q = TWO 4-INCH PIPES = <br />4.000 INCHES <br />0.0872 SQUARE FEET <br />0.500 <br />0.167 FEET <br />0.1429 CUBIC FEET PER SECOND <br />64 GALLONS PER MINUTE <br />128 GALLONS PER MINUTE <br />DISCHARGE THOUGH A SUBMERGED TUBE <br />• <br />DIAMETER OF PIPE <br />AREA OF PIPE <br />C = LOSS COEFFICIENT <br />H = HEAD ON SPILLWAY <br />Q = C A (2GH)^.5 <br />Q = <br />Q = ONE 6-INCH PIPE _ <br />6.000 INCHES <br />0.1963 SQUARE FEET <br />0.500 <br />0.250 FEET <br />0.3937 CUBIC FEET PER SECOND <br />177 GALLONS PER MINUTE <br />P-9-9 <br />09-27-95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.