My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62519
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:53 PM
Creation date
11/20/2007 7:35:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
GENERAL DESIGN FOR HAUL ROAD DITCH POROUS ROCK CHECK DAMS
Section_Exhibit Name
TAB 13 ATTACHMENT 13-6A
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intr <br />NOy C-95-007 was issued for failure to minimize erosion and <br />siltation associated with road drainage structures applicable to <br />roads outside the disturbed area. Two areas in particular, at the <br />outlets of Culverts ME-5 and G-2, were receiving an extraordinary <br />amount of silt. To assist in minimizing the erosion and siltation <br />taking place along the Mine Entrance Road and Haul Road G an <br />additional alternate sediment control measure will be implemented. <br />General designs for porous rock check dams have been calculated for <br />each road. These designs were for check dams that would be placed <br />approximately 500 feet apart. Straw bale barriers in combination <br />with the rock check dams will be installed along both haul road <br />ditch systems. Utilizing this alternate sediment control measure <br />should minimize the amount of silt being carried through Culverts <br />ME-5 and G-2. <br />General Design Analysis <br />The hydrology of the watershed for each section of haul road that <br />the check dam would control was analyzed utilizing the SEDCAD+ <br />computer program. In performing this analysis, the characteristics <br />of the local site drainage and haul road ditch statistics were <br />considered and utilized. Table 13-6A-1 contains the design <br />hydrology summary. <br />TABLE 13-6A-1 <br />DESIGN HYDROLOGY SUMMARY <br />Description i0 Yr - 24 Hr Storm <br />MINE ENTRANCE ROAD HAUL ROAD G <br />Precipitation Depth 1.6 in. 1.6 in. <br />Runoff Volume 0.03 ac.-f t. 0.01 ac.-f t. <br />Peak Discharge Rate 0.35 cfs 0.10 cfs <br />• Input consists of precipitation amount (inches), watershed area <br />(acres), time of concentration (hours), runoff curve number (CN), <br />13-6A-1 Revised 06/08/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.