Laserfiche WebLink
Reclamation cost, continued: <br />• 5, Cover spoil rile <br />Dozer, 16 hrs ~ $75.00 plus miscellaneous...... $2000.00 total <br />6. Remove Levris Gulch fill <br />Remove 8800 cy of fill and 260 ft 60 inch pipe: <br />D-8 dozer 40 hrs @ $75,00/hr ................ $3000,00 <br />Loader, 60 hrs ~ $60.00/hr .................. 3600.00 <br />Truck, 60 hrs L $40,00/hr ................... 2400,00 <br />D-6, 16 hrs ~ $50.00/hr ..................... 800,00 <br />Lovr Boy, 4 hrs C~ $40.00/hr .................. 160 00 <br />99 0.00 <br />Re-seed 2.5 acres c~? $480.00 .................... 1200.00 <br />$11,160.00 iot~i <br />SUMMARY Or RECLAMATIGN COSTS: <br />1, Seed and mulch 8 ac ± ............................$ 3,84G.oo <br />2, Seal II1ne or,enings...,....,...•...• ............... 5,61G,OG <br />3. Scarifying and cutting vrater bars ................. 480.00 <br />• 4. Removal of equipment from site .................... 12,520.00 <br />5, Cover spoil pile .................................. 2,000.00 <br />6. Remove Levris Gulch fill ........................... 11,160.00 <br />GRAND TOTAL RECLAP4ATION COSTS ..............$35,610,00 <br />R~tCEii/ED <br />OCT 211983 <br />MINED LAND RECLAMATION DIVISION <br />Colo. Dept. of Natural Resources <br />• <br />92a (Rev.) <br />