My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62476
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:51 PM
Creation date
11/20/2007 7:34:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05 OPERATION AND RECLAMATION PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~~0~~® <br />less). The unit charge of explosives per delay or per <br />OCT 21 1983 ~ <br />• hole vrill not exceed 5 pounds, <br />Blasting will be the responsibility of thef~I~ORS~~~"'fA'IMltTION DIVISION <br />o a ural Resources <br />contractor who will be required to submit his or her <br />blasting plan prior to any blasts, The plan shall be in <br />accordance with the regulations of the Mined Land Reclamation <br />Board and acceptable industry standards. <br />All excavated materials will be placed in a position con- <br />sistent with the reclamation plan for the mine site. A <br />portion of the north spoil area toe dike vrill be utilized <br />to Fover the mine development vraste pile, See Appendix B <br />for stability analysis of fill slopes, <br />8. Coal Handling Structures <br />Coal handling structures at the mine have been designed to <br />convey the coal coming from the underground mine belt to a <br />• location suitable for surge stockpiling and convenient <br /> loading of trucks, The handling facilities will be <br /> constructed in phases as the mine progresses and capital <br /> reserves are built up. Initially a stacking conveyor will <br /> transfer the coal to a stockpile for loading trucks erith a <br /> front end loader on the site bench, The conveyor '::ill be <br /> rotated for stockpiling mine development waste •rihich tivill <br /> be carried to the north spoil area by front end loader or <br /> tandem truck. The second phase of construction will add <br /> an additional stacking conveyor, a conveyor-fed hopper, <br /> a rigid frame transfer conveyor, and a truck loading bin <br /> and/or a domestic coal tipple, If the tipple alternative <br /> is selected, a truck scale will also be added, The truck <br />• <br /> loading bin and/or tipple ~.vill be located or_ the Lewis Gulch <br />S 3 (Rev,) <br />
The URL can be used to link to this page
Your browser does not support the video tag.