Laserfiche WebLink
•ii ii iiii iii iiiiu iii • <br />999 <br />PART I <br />• Page lb of 19 <br />Permit No.: CO-0036684 <br />A. TERMS AND CONDITIONS (Continued) <br />c) Effective during periods of precipitation greater than the 10-year, <br />24-hour event for this facility. <br />Any discharge or increase in volume of a discharge caused by <br />precipitation within any 24-hour period greater than the 10-year, <br />24-hour precipitation event (or series of storms or snowmelt of <br />equivalent volume) may comply with the following limitations instead of <br />the limitations of item a) and b) immediately preceeding. <br />Flow - (MGD) - monitoring only per Part I.B.1. <br />Electrical Conductivity, micromhos/cm - monitoring only per Part I.B.1. <br />pH - (Standard Units) shall remain between 6.5 and 9.0 c/. <br />011 and grease shall not eaceed 10 mg/1 c/ in nay grab sample nor shall <br />there be a visible sheen. <br />d) Additional conditions-effective at all times. <br />There shall be no discharge of floating solids or visible foam in other <br />than trace amounts. The discharge shall not contain any sanitary <br />• sewage or other pollutants not associated with active mining operations. <br />2. Requirements for Effluent Limitation Compliance Determination <br />The permittee shall have the burden of proof that a discharge was <br />caused by a precipitation event in order to qualify for the alternate <br />limitations in Part I.A.l.b or I.A.l.c. In the absence of satisfactory <br />proof, the limitations in Part I.A.l.a shall prevail. Monitoring of <br />all effluent parameters shall be required as per I.B.1, regardless of <br />the cause of the discharge. <br />3. Post-Mining Areas <br />Commencing at the time active mining has ceased and surface areas have <br />been returned to the required contour, all applicable discharges shall <br />be subject to limitations other than those specified in Part I.A.1. <br />These post-mining limitations shall remain in effect until bond <br />release. The permittee shall notify the Division upon cessation of <br />active mining so that appropriate permit modifications can be made. <br />See Part I.C. for Footnotes <br />Amended 03/26/85 <br />• Amended q~~p~gn Effective a~~~in~ <br />Code: 1 - 8 Date: 9 - 84 <br />