My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27090
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:29 PM
Creation date
11/20/2007 7:32:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Hydrology
Doc Date
5/19/2006
Doc Name
1st Quarter 2006 Sediment Pond Inspection Reports
From
Energy Fuels Coal, Inc.
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(17) <br />Mine: Southfield <br />NPDES ID. No.: Pond #5 <br />Inspection Period: First Quarter 2006 <br />Inspection Date: March 30, 2006 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies north east of the main facilites area. All drainage from the <br />reclaimed mine facilities area is directed to this pond. The primary discharge gate has been disabled <br />in the open position, ensuring that the pond functions as a "pass-through" facility- <br />EMBANKMENT <br /> <br />1). Adequacy of the vegetative cover. Excellen Ivloderafe Few Poor <br />2). Erosion forming Gullies: Extensive Some Few oN ne <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes No ~-~ <br /> At the principal spillway inlet? Yes No c:__ <br />4). Erosion of the downstream toe of the embankment? Yes No L~ <br /> Cause of erosion can be attributed to: <br /> <br /> <br />5). Is seepage occurring through the dam? Yes No ~ <br /> Could this seepage cause potential instability? <br /> <br /> <br />PRINCIPAL SPILLWAY <br />f ). Is the principal spillway system in working order? Yes L- No <br />2). Is the inlet free of debris and restrictive material? Yes L- No <br />3). Is the discharge outlet free of restrictive material? Yes (i- No <br />4). Is erosion occurring at the discharge outlet? Yes No t/ <br /> Evaluate the severity: Extensive Moderate Just starting None <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.