Laserfiche WebLink
Review Checklist for Pond Inspection Reports <br />Pond inspection period: lgt quarter 2006 <br />Mine :Edna <br />CDMG permit no.: C-1980-001 <br />Date review completed: May 12, 2006 <br />CDMG reviewer: Byron G. Walker <br /> Require- <br /> <br />Requirement Requirement ment <br />complied <br />Comment <br /> citation with ? <br /> es/no <br />Quarterly reports <br />Timely submittal of CDMG regulation PAP, page 4.6-138 (no time <br />quarterly pond inspection 4.05.9(17) Yes specified). Required by June 30, <br />report 2006, received May 3, 2006 <br />Qualified inspector CDMG regulation <br />4.05.9(17) yes Accomplished by Chris MiOer <br />Content of quarterly report CDMG regulation <br />(structural weakness, other 4.05.9(17) yes) All observed through snow cover. <br />hazardous conditions) <br />