Laserfiche WebLink
STATE OF Cd~LCjRADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />20, <br />Mr: Joe Gagliano <br />LJ Development, Inc. <br />256 N. Merrill Drive <br />Pueblo West, Colorado 8 <br />RE: <br />Information <br />Deaz <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />~- <br />Permit N . M-2006-081; A equacy Review - <br />Listed below are the additional items and information we requested in order to complete our <br />adequacy review on the Big "G" Gravel Pit, New 112 Application, Permit No. M-2006-081. The <br />Division of Reclamation, Mining, and Safety (Division) is required to make an approval or <br />denial decision no later than March 19, 2007, therefore, your response to the following adequacy <br />review concerns should be submitted to the Division as soon as possible. Your response should <br />include two (2) copies. Any public comments that we receive on your application during the <br />interim will be forwarded to you. <br />Rule 6.4.4 Exhibit D-Mining Plan <br />It was stated that the operator would set up an on-site processing station. Please provide <br />the following details regarding the proposed station(s): <br />a. What is the nature of the structure -will the processing station be an <br />asphalt hot mix plant, a concrete batch plant, or will there be multiple <br />processing stations onsite? <br />b. Is (aze) the plant(s) on site to be permanent structures (with a foundation), <br />or are they to be in place temporarily? <br />c. Will the use of water for the operation of this (these) facility(ies) be <br />necessary? If so, in what quantities and from what source? <br />2. Please provide the source of the water to be used for dust suppression. <br />Rule 6.4.5 Exhibit E- Reclamation Plan <br />3. Please provide anticipated quantity (cubic yards) of topsoil on-site at all times. <br />4. Please provide anticipated quantity (cubic yards) of construction stockpile material on- <br />site at all times. <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines <br />