Laserfiche WebLink
• <br />EXHIBIT "L" <br />RECLAMATION COST <br />ITEM COSTIUNIT UNIT TOTAL UNITS COST I ACRE <br />GRASS SEED MIX $68.23 ACRE 50.00 $3,412 <br />DRILLING GRASS SEED $78.00 ACRE 50.00 $900 <br />FERTILIZERd0#IA N8P $9.88 ACRE 50.00 $494 <br />FERTILIZER APPLICATION $3.50 ACRE 50.00 $175 <br />TOP SOILING WIDOZER OR LOADER $0.75 LCY 50417.00 $37,813 <br />'•MAX PUSH 250 FEET•• six inches <br />REPLACING OVERBURDEN flood dike $0.60 LCY 107500.00 $112,500 <br />use scraper to move dirt to dike. <br />DISKING OR SCARIFYING $28.50 ACRE 50.00 $1,425 <br />WEED CONTROL $30.00 ACRE 50.00 $1,500 <br />4000#I ACRE GRASS HAY OR STRAW $170.00 ACRE 50.00 $8,500 <br />SPREAD 8 CRIMP MULCH $49.00 ACRE 50.00 $2,450 <br />BACK SLOPING (DONE WITH MINING) $0.00 ACRE 0.00 $0 <br />MOBILIZATION 8 DEMOBILIZATION $750.00 LUMP SUM 1.00 $750 <br />TOTAL DIRECT RECLAMATION COST $169,918 <br />INDIRECT COST OVERHEAD 8 PROFIT <br />( PUBLIC LIAB. INSURANCE) 1.550% $2,634 <br />(CONTRACTOR PERF. BOND) 1.550 % $2,634 <br />(CONTRACTOR PROFIT) 10.000% $16,992 <br /> ------522,259 <br />DMG PROJECT ADMINISTRATION EXP. 5.000 % $9,609 <br />TOTAL PERFORMANCE BOND AMOUNT <br />5201,786 <br />COST PER ACRE of the 50 Acres <br />L-VANS PIT # 2 <br />54,036 without the water <br />for the permanel lake. <br />L-1 <br />