Laserfiche WebLink
<br />EXHIBIT D-2 - SOILS AND VEGETATION INFORMATION <br />Bachelor Mines-Syracuse Level - Federal Resources Corporation <br />Page 6 <br />-5- <br />Reclamation Recommendations Batchelor & M'edge) <br />As spoil dumps are being removed, care should be taken to leave approxi- <br />mately 1 foot of fine spoil material and hopefully original topsoil. This <br />material will provide somewhat of a seedbed and act as a water holding media. <br />However, if at all possible, the newly stripped area should be topsoiled at <br />least 4" deep and tilled into the underlying material. <br />Since both mine t3umps are in drainage areas, it will probably be nec- <br />essary to put in water diversions ~ re uce s ope lengths and reduce ero- <br />sion. The site should be reshaped as to conform with the surrounding natu- <br />ral landscape. Landscaping with rock and logs will help break up slopes and <br />provide small water catchment pockets. (Also see Seedbed Preparation on <br />Page 2.) <br /> <br /> <br />