My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62241
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:41 PM
Creation date
11/20/2007 7:28:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Report of Subsidence Study (6/83) and Addendum
Section_Exhibit Name
VOLUME 3- SUBSIDENCE STUDY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Pdditional strain calculations are located in Valune 3. LUriny this <br />initial aid future permit tErms, additional s~sidence monitoring will <br />verify the calculated effects of partial extraction. 6b structures will <br />be undermined during the initial permit farm. <br />H. 1Ylequaba protection, monibaring, and mitigation measures for identified <br />pipel roes is addres~d in Section 2.05.6(6) (e) (iv) aid in the Subsidence <br />l~pair Handbook, Volume 3. <br />I. Str~tures within tha permit area have been de~ribed aid are adequately <br />prof ec fed as described in Section 2 .05.6 (6) (f) (ii) (B) (I I) . wne will be <br />undermined during the initial permit arm. Pdditional monitoring will <br />verify proposed protective measures. <br />J. A teclnical analysis of projected deflection aid bending of pipelines is <br />presented in Volume 3. PppropriatE subsidence mrnitoring (leak demo- <br />tion) is de~ribad in the Subsidence l~pair Handbook, Vnlune 3. <br />K. A mrnitnriny plat aid Harming procedure for Steven's (lalch Read is <br />located in Sbction 2.05.6(6)(f)(iv)(A) aid in the 9ibsidence F~pair <br />Handbook, Volume 3. East Iba~ap Creek access is a controlled access, <br />1 fight traffic trail . The monitoring aid earning procedure is (bind in <br />the Subsidence Impair Handbook, Volume 3. <br />L. A cl ar ified Sl~bsid ence Nntrol Pl ai is 1 ocabed in ~c tion 7 .05.6 (6) (f) <br />(ii)(B)(III) rhich staffs that for structures, a 300 ft. buffer acne <br />will be maintained around occupied structures finless o~.ners are <br />consul bed. <br />• M. Calculations supporting pillar stability are locab:d in the Pillar <br />Stability 12 port, Volume 3. Site specific monitoring, as describe3, <br />will be gatl~red aad Evaluated m verify these. calculations. Justified <br />changes ~,ould then be made >p future barrier pillar design. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.