Laserfiche WebLink
<br />DIVISION OF MINERALS AND GEOLOGY <br />Dcpanmrm of Nalu ral Resoruces <br />131 J Sherman 51.. Roam '? 15 <br />Denver, Colorado 80'03 <br />Phone: 0011 Bhh-J 56: <br />r,~x: an n nr_ n I orr <br />October ~, 1998 <br /> <br />__GTATF (~F <br />III IIIIIIIIIIIIIIII - <br />II~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Diane E. Anderson R°r Romer <br />Thane R. Anderson Govern°r <br />lames 5. lochhead <br />25655 Routt county Road 33A E>tecutive Director <br />P.O. Box 880337 rvtichael B. Long <br />Steamboat Springs, CO 80488 Drvisi°n Dvecror <br />RE: Johnson Excavation, Inc., Permit No. M-98-058 <br />Tellier Gravel Pit 112 Permit Application <br />Dear Diane & Thane Anderson, <br />The Division of Minerals and Geology received your letter dated September 21, 1998 objecting to the approval of the <br />l 12 permit application for the proposed Tellier Gravel Pit, Permit No. M-98-058. Under [he Construction Material <br />Rules and Regulations, three public meetings will be held, and are as follows; <br />Informal Conference (Rule 1.4.6) The purpose of the informal conference is to identify all parties to the proceedings <br />and formal Board Hearings, determine what issues have been resolved (if any), and if there are additional issues, <br />identify the issues that the Board, by statute, havejurisdiction to address, and explain the hearing process. The meeting <br />will be held at the Routt County Courthouse in Steamboat Springs on October 20,1998 at 8:30 a.m. <br />Pre-hearing Conference (Rule 2.7) The Pre-Hearing Conference will be presided over by the Pre-Hearing <br />Conference Officer. The Pre-hearing Conference Officer is appointed by the Mined Land Reclamation Board. The <br />purpose of the Pre-Hearing Conference is to draft a hearing order that lists issues [he full Board should consider, lists <br />the witnesses and evidence to be presented by parties, lists the parties that will participate, determine the amount of <br />time afforded each party, and to resolve any other issues that the Pre-hearing Conference Officer determines is <br />appropriate. The Pre-Hearing Conference will be scheduled between November 6 and November 10, 1998. <br />Formal Board Hearing (Rule 2.8) The Board will conduct the Tellier Gravel Pit hearing according to the provisions <br />of the adopted hearing order, the Administrative Procedures Act, Section 24-4-105, Colorado Revised Statutes <br />(C.R.S.), and the Colorado Code of Regulations, 2 CCR 407-4, Section 2.8. The Formal Public Hearing will be held <br />during the November 18-19,1998 Board meeting. The hearing will be held in Room 318 of 1313 Sherman Street, <br />Denver, Colorado, beginning at 9:00 a.m. or as soon thereafter as the matter can be considered. - <br />If you have any questions regarding these three meetings, please do not hesitate to call. <br />SinS~rely, <br />Erica Crosby ~ 1 <br />Environmental Protection ecialist <br />COLORADO <br />cc: Carl Mount; DMG <br />CD Johnson; Johnson Excavation, Inc. <br />Kent Crofts; IME <br />