Laserfiche WebLink
• Listed on the following pages are the SEDCAD runs for the 10yr-24hr and 25yr-24hr precipitation <br />events that would influence Pond 012 design. There is also a section near the back of this <br />Attachment that deals with the safety factor the embankment of Pond 012 will have. 2.05.3(3)-12- <br />1, Map 2.05.3(3)-12-2 and Map 2.05.3(3)-12-3 shows more detailed drawings of Pond 012. <br />• <br />• <br />REVISED MARCH 2006 Attachment 2.05.3(3)-12-2 <br />