Laserfiche WebLink
<br />COLORADO DEPARTMENT OF HEALTH, Water Quality Control Division <br />Renewal Permit Rationale - Page 3. Permit No.: COC-850000. , <br />II. Permit ChangPS (continued) <br />Other changes: The boiler plate language in Part I. Section C., and Part <br />II. is being revised to reflect the more condensed language currently <br />used in individual permits. Where changes were necessary to reflect the <br />differences between general permit requirements and individual permit <br />requirements, such changes have also been made. <br />No other significant changes are being made to this general permit. <br />III. Reporting <br />There have been occasions where specific permittees have not properly <br />followed the Noncompliance Notification Requirements specified in Part <br />II.A.3. of the permit. Where a request for relief from total suspended <br />solids and total iron and/or settleable solids limitations is desired, <br />the permittee must also submit [he documentation specified under Part <br />I.B.l.d) - Burden of Proof Requirements, Failure to do so may result in <br />enforcement action and/or revocation of authorization to discharge under <br />the general permit. <br />IV. Whoie Effluent Toxicity (WET) Testing <br />Section G.9.7(2)(a)(i)(A) of the Regulations For the State Discharge <br />Permit System b.1.0 (SCCR 1002-2) exempts facilities certified under this <br />general permit from WET testing requirements. <br />V. Antidegradation <br />The discharges certified under [his permit are not reviewable waters <br />pursuant to section 3.1.8(3)(a) of the Basic Standards and Methodologies <br />for Surface Waters 3.1.0 (SCCR 1002-2). <br />Jon G. Kubic <br />January 16, 1992 <br />VI. Public Notice Comments <br />Verbal Comments were received by EPA Region VIII. Their primary concern <br />related to the compliance dace Eor construction and/or related <br />activities. The draft permit stated that this dale was three years after <br />the effective date of the permit. It was the Division's intention to <br />state that attainment of operational level would occur as soon as <br />possible, but in no event lacer than three years after the permit becomes <br />effective. The final permit will clarify this to indicate that the <br />Division will permit reasonable timetables for construction with <br />appropriate completion daces; but, [he latest date acceptable for <br />completion will be June 30, 1995. A long construction schedule will be <br />approved only if major construction is required. The Division will <br />ensure that no construction schedule is excessively long. <br />