Laserfiche WebLink
c, .. <br />' ~ • <br />Mr. James L. Schmieding <br />March 20, 1978 <br />Page 2 <br />measurable injury to Buffalo Canal" and "will cause hardship <br />to water users along the entire Lower Arkansas Valley." <br />From 1948 to date we have riad no complaint from water users, <br />We have been unable to find a statutory requirement <br />for augmentation. If there is such a requirement, we would <br />appreciate being advised. <br />3. The effects of past floods in this area deny any <br />validity to the conjectures of the DWR with regard to channel <br />changes. Past flooding has filled the lake areas with sand <br />to such an extent that areas which used to be lakes are now <br />sandy river banks. This refill possibility was pointed out <br />on page 11 of our application. <br />If we can be of further assistance in responding to the <br />DWR memorandum, please let us know. <br />Yours truly, <br />1 ~..~, <br />Frame k~J(7be <br />Executive Vice President <br />