Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denw±r, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.watecuate.m.us <br />RECEIVED <br />Op'~ <br />ti <br />t~ <br />F <br />f <br />w <br />~ re78 ~ <br />I~ll~ ~ 6 ~1 <br />Oisisian et Minerals end Geology <br />Response to Reclamation Permit Application Consideration <br />DATE: November 16, 2004 <br />TO: Thomas A. Schreiner, Environmental Protection Specialist <br />CC: Division 1 Office, District 7 Water Commissioner <br />FROM: loarta Comaniciu, E.I.T. <br />RE: MMRR Quarry, File No. M-2004-067 G~a4: <br />Operator: Clear Creek District Water Providers, LLC-303-773-1005 <br />Contact: Banks and Gesso, LLC-Paul Gesso-303-274-4277 <br />Section 26, Twp 3 South, Rng 72 West, 6th P.M., Gilpin County <br />CONDITIONS FOR APPROVAL <br />Bill Oxere <br />Governor <br />Russell George <br />Executive DireROr <br />Fiat D. Simpson, 8E. <br />Slate Engineer <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. However, this project will affect two unnamed <br />drainageways (surtace water) located in the quarry area and that will flow onty as a result of rainfall or <br />snowmen. The applicant must show that no Injury to other vested water rights will occur as a result of <br />this quarry project. <br />^ The proposed operation will consume ground water by: ^evaporation, ^ dust control, ^reclamatlon, <br />^water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing wafer rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />® The applicant has identified that the only water requirement for this project will be for dust control. All <br />water will be trucked into the site. If water will be used for any other purpose at this site, the applicant will <br />need to document That the water was obtained from a legal source, or the water was diverted in priority <br />under a water right decreed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Othervvise, the operator will need to make replacements for evaporation. <br />The applicant may contact the State Engineer's Office with any questions. <br />