My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27008
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:25 PM
Creation date
11/20/2007 7:25:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Hydrology
Doc Date
11/25/1985
Doc Name
STABILITY OF SPOIL PILES AT PORTALS OF ACCESS DRIVES
From
TERRA THERMA INC
To
NEW CASTLE ENERGY CORP
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Clem Parkin -3- November 21, 1985 <br />4. Portal ~2 <br />The proposed dump adjacent to Portal ~2 is located in somewhat flatter <br />terrain, and is thus even less likely to exhibit slope movement than the pile <br />at Portal N1. The amount of materials to be dumped is 2000 cubic yards, also <br />somewhat less than at Portal N1. Again, the parameters given above suggest <br />that stability of the pile will not be a problem. It is again recommended <br />that the area be stripped of topsoil, and where possible surface water be <br />directed away from the face of the pile. Progressive reclamation is also <br />recommended. <br />5. Monitoring <br />It is recommended that monitoring be limited to occasional visual observation <br />of the crest and toe of the piles during their construction. If excessive <br />movements occur, the effects of these can be immediately mitigated by cleanup <br />or modification of the dumping schedule. Normal care should be taken in <br />dumping the materials, as it is possible that some movements of the structure <br />may occur, even in a material with the above favorable parameters. <br />6. Summary <br />In summary, it appears that the piles proposed will be stable, as a result of <br />the relatively strong foundation materials, the considerable depth to the <br />water table in the proposed dump area, and the expected good strength and <br />drainage of the piles themselves. If desired, the piles could be reclaimed in <br />place, and remain stable indefinitely. <br />I trust that this letter provides the additional information that you require. <br />Should there be any questions, please do not hesitate to call. <br />Respectfully submitted, <br />TERRA THERMA INC <br />adM~~~ <br />Adrian Brawn, P.E., Vice President <br />• Terra Therma Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.