My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE62027
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE62027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:08:29 PM
Creation date
11/20/2007 7:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988108
IBM Index Class Name
Permit File
Doc Date
11/23/1988
Doc Name
FN M-88-108 WESTERN AGGREGATES INCS LIGHTWEIGHT AGGREGATE PIT JEFFERSON CNTY ADEQUACY LETTER
From
MLRD
To
HYDRO SEARCH INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paul Banks -3- November 23, 1988 <br />14. Please consider diverting surface water around the waste stowage sites <br />by utilization of upland berms, mounded profiles, etc., thereby <br />minimizing the percolation/infiltration potential of the waste <br />materials. <br />15. a. Please provide the catchment area reporting to the southern and <br />western upland diversion ditch, the diversion ditch channel sizing <br />and channel-lining erosion control and energy dissipation measures <br />proposed. <br />16. Please consider establishing drainages down the slopes at the southern <br />pit area rather than attempting to create a long-term upland diversion <br />ditch to feed into the stock pond from the northwest pit area. <br />17. Table E.1, Re vegetation Mix, identifies that 0.5 lbs PLS of "Rimcon" <br />four wing saltbrush winterfat will be planted. Please clarify if both <br />fourwing saltbrush and winterfat will be planted or only one of the two. <br />18. Please provide a reclamation plan and associated costs for the plant <br />site, if it will be incorporated into the permit as affected land. <br />Exhibit H - Wildlife' <br />19. ,4 copy of the application was transmitted to the Division of Wildlife <br />for their review and comment, if any. Any response will be forwarded <br />to you for your files. <br />Exhibit L - Reclamation Costs <br />20. Exhibit E - Reclamation Plan, states that the current quarry <br />disturbance measures approximately 30 acres. However, reclamation <br />costs are proposed for 20 acres. Please clarify. <br />21. Please include the cost of: <br />z~. ripping the quarry slopes and floor; <br />t.. placing 1 foot of gravel atop ripped slopes and floor; <br />c. replacement of 4 feet of overburden; <br />d. water bar/terrace construction; <br />e, diversion canal or drainage channel construction; <br />f. backfilling the waste stowage trench; <br />g. processing plant reclamation; and, <br />h. project foreman/supervisor for the 30 acre initial disturbance, <br />including volume and cost calculations. <br />CM/es <br />1588E <br />
The URL can be used to link to this page
Your browser does not support the video tag.