Laserfiche WebLink
~~ <br /> <br />Mr. Bob Freitag <br />Page -2- <br />other pits~not previously identified for topsoil salvage) such <br />topsoil will be saved (and stabilized) for reclamation purposes. <br />2. All final graded elopes will be no greater than 2:1 (h:v) (Rule <br />6.1), with the exception that elopes of the Ansley Flat Pit, <br />as stated in your plan. will be no steeper than 3:1. <br />3. The appropriate diversion and sediment catching structures, as <br />recommended by the Soil Conservation Service for the P.oberte <br />Tunnel, A. L. Hill and Valley of the Sun Pits will be constructed <br />before sumsaer 1981. <br />4. If plans for a recreational area (ball park) for the Woodside Pit <br />are changed, the site will be reclaimed by grading, and revegetation <br />(as per $oil Conservation Service recommendations), unless an <br />alternate reclassiation or land use plan is developed, at which <br />time we are to be inforsued. Reclamation of this site is to be <br />carried to completion within 5 years (Rule G) from the date of <br />Chia letter. <br />5. Ttse Valley of the Sun Pit saaq require an Army Corps of E:rgineers <br />404 permit. I suggest you call the Resident Er~Eineer in LittlQton <br />for ssnre information. <br />He vial be happy to consult with you when it is time for reclamation of <br />these pits. <br />Sisucrely, <br />Mike $tantOn <br />Reclamation Specialist <br />rLSsya <br />