I - t I APPROXIMATE CL LOCATION
<br />APPROXIMATE `- I�'l I -I .I I OF THE McCANNE DITCH LOCATION OF PERMIT
<br />EAST LINE BOUNDAR�r • RECHARGE WELL �- I fI I t -- FULTON DITCH
<br />E1/4 COR., St /16 COR., SE1/4, SEC. 18 15' TELCO ■ Cam, PROPOSED J I 30' E1 /4 COR., LAMA
<br />C.18 SEC. 18 EASEMENT-1 ■ ■ r 30' SEC.19 1 I SE COR.,
<br />24<7SEC.18 120' ROW ROW ROW TEMPORARY BERM L SEC.19
<br />E - _ f �E - -- = E. - _ E - - _ _ E -°.`. - f = L E 1_ [ C L E L L L E E _ - -_ -
<br />- � - �E '- L - - L �' E E E E t
<br />n � � I�VI'1✓ f _ _ /'
<br />Ip�
<br />T
<br />C ' ti 4 V 1:1 MINING
<br />1 RR 1/ (
<br />,..,1 \ -:, TOE OF MINE LOPE HIGH WALL / / MINIRGP) Onq qq nnnq OClq ggqnnn nngppa\OO
<br />10' UNITED Q' TOE OF MINE P O' ROW NIIHIN 95 ;x OF THE
<br />SETBACK NE 7 NOT TO ENCROACHE \O�
<br />i ❑ / T PROPOSED , HIGH WALL
<br />Ati
<br />POWER _ < L r SLOPE NOT TO FULTON DITCH J1 p2r-Alt_R WITHIN 95 OF THE t I 1 AC. I
<br />l EASEMENT - ENCROACH WITHIN LATERAL (TYP.) 77 A ,PWAt_T 15ATC44 PLAJJT FULTON DITCH 13 FRESHWATER r
<br />1 APEA - 4.7 Ar. - LATERAL (TYP.) ELECTRIC I
<br />- - - - FULTON DITCH I •Z 30' GASLINE G 1 \ POND
<br />-� +I 11 (TYP.) LATERAL (TYP) I ® O / / SETBACK I V 18 3TV EACH D I pnggngnqqnqapnv
<br />,� N 7 \
<br />- - - MINI G AREA = 18.7 AG. AREA = 17.7 AG. AREA = 16.6 AC. AREA = 21.4 AC. SIDE p
<br />TEMPORARY HIGH WALL 7 DRAINAGE SWALE 25' I pnpnonnnq qQ/
<br />BERM 7 FOR PROCESSING SETBACK 0 't �� - - J 1
<br />1' ®
<br />18'
<br />CONHVEYOR 14 I AREA PROPOSED 'U
<br />I 100' ROW
<br />CROSSING SILT /SETTLING POND
<br />I I 0
<br />AREA = 20.7AG. I I AREA = 16.8 AG. I B I I h:1 �) AREA
<br />Ognnn ggqq nggqqnnnnqn nggnnn ggqn qq DODOOggnnnqql�qq0 ggpnqqq Onggq [7nggnn ggpnn0 ggnnqqnnqnqnqqnnq I (MINI G 1
<br />O
<br />1 O I HIGH WALL O
<br />50' 6A5LI1JE 1 :0 rr, �: PROCESSING AREA AND I AREA = 17.7 AC.
<br />EASEIr NT GAS WELL QO TOE OF MINE SLOPE 1:1 (TYP.) CONCRETE AND ASPHALT CONVEYOR I 25' SETBACK
<br />,i O I I MININNG CONVEYOR
<br />}� 110' SETBACK QO NOT TO ENCROACH I / I TOE OF MINE SLOPE
<br />1 O WITHIN 75' OF WCR 8 RICH WALL HAUL ROAb BATCH PLANTS CROSSING I � ` 5p' PANHANDLE
<br />k UTILITIES (TYP.) 1 I :� NON- EXCLUSIVE NOT TO ENCROACH I
<br />PEUNE EASEMENT WITHIN 75 OF WCR 6 1
<br />GAS WELL I I MI (TYP.) I 10• ��, ♦ 25' SETBACK UTILITIES (TYP.)
<br />dI 1 TEMPORARY BERM 65' EASEMENT QO (( 25' SETBACK I O HIGH l / APPROXIMATE
<br />P / `APPROXIMATE SETBACK QQOQ MININGP) I FROM WCR 8 I 1 1\ I - - - - -AREA = 232 RG. / J I OW `�� _ TOE OF SLOPE /
<br />TOE OF SLOPE �I}° HIGH WALL �IT % /
<br />5 O "I � � � � ROW `� i � \ � /
<br />II I 25' PROPERTY O O OQ AREA - -013.8 AG. � 110' GAS WELL I PANNE DITCH � \
<br />AREA = 14.7 AG. O Row \ _
<br />1 I LINE SETBACK Q 30' ROW SETBACK 25' PROPERTY
<br />O -.
<br />\ \ Z
<br />LINE SEIBA Z / I SSEC 18
<br />1 1:1 (TYP.) QOO TOE OF MINE SLOPE
<br />AA NOT TO ENCROACH MINING 'I \
<br />MINI G
<br />O° 4 PIPES TO TEMPORARY BERM ° \
<br />HIGH WALL p
<br />WITHIN 75' OF WCR 8 HIGH WALL DISCHARGE EXISTING r� \
<br />• t - it 'I� /. APPROXIMATE QO° k UTILITIES (TYP.) WATER TO I PIPES TO DISCHARGE GAS WELL /� Q \ \
<br />ROECHARGE WELL QQ °° 4 1 SILT PONDS I WATER TO SILT PONDS �L (lj� �/ O o \
<br />y v- O
<br />C _:1 f
<br />AREA = 19.5 AG. AREA - 18.1 AG. O 1 I 13 15 I ! II Gc'4
<br />O - _ 4 PIPES TO DISCHARGE AREA = 14.4 AG. AREA = 14.0 AG I i o Oa O�
<br />WATER TO SILT PONDS PROXIMATE I AREA = 19.6 AC. TOE OF MINE SLOPE I I I;t o
<br />i AREA = 18.5 AC.
<br />SILT /SETTLING POND �
<br />/ 1:1 iYP.) 25'
<br />35 BLD �' - MINI ((G 25' PROPERTY ALL TREES ALONG SH85 SHALL BE I NTED NOT TO ENCROACH
<br />AREA = 11.9 AG. , i `? TOE of SLOPE a / SETBACK
<br />SETBACK '" HIGH WALL LINE SETBACK ON SW TKO JOINT VENTURE PROPER SO WITHIN 100' OF SH 85 1:1 TYP.)
<br />1 I' � THAT THE DRIPLINE OF THE TREES D S APPROXIMATE
<br />50' PROPERTY `. � - TOE OF SLOPE R.O.W. (TYP.) HINHRG
<br />1 1 �� - - - - _ _ _ - _ EXTEND INTO THE CDOT RIGHT -OF -WAY AT HIGH WALL
<br />- - URDEN MATURITY S ) - (TYP). PROPERTY
<br />_ DISCHARGE ( )
<br />_ )) REA = 6.7 AG. ( LINE SETBACK
<br />TO EXST. R
<br />LINE SETBACK OVERB OW 4 PIPES TO -
<br />1�+ iW _I - DISCHARGE DISCHARGE
<br />DISCHARGE I . -- _ - - - __ -- -�'=- -- - - - ---- - - - - -- - -- -- I
<br />TO RIVER ` ,� TO RIVER WATER TO ♦ II
<br />DISCHARGE - --- p� r� NA HISTORIC SILT PONDS W�e,Y B5
<br />TO EXIST ROW - -- �.. •`�-- •"�17� - DRAINAGE HI&H
<br />\ s'
<br />�-- APPROXIMATE CL LOCATION�� - - - - - -- - EASEMENT _
<br />OF OGILNE SEEPAGE DITCH TOE OF MINE SLOPE
<br />- - - - - -
<br />- --- - - - -- - - - - -- -- - - -- - - -L --
<br />NOT TO ENCROACH -
<br />WITHIN 100' OF SH 85 C1 /4 COR., -
<br />R.O.W. (TYP.) SEC.18 WEST LINE NO ACCESS t1
<br />SE1 /4, SEC.18 EASEMENT / \
<br />APPROXIMATE CL LOCATION
<br />APPLICANT:
<br />LUP70N LAKES RESOURCE,
<br />OF PORTER SEEPAGE DITCH
<br />SW TKO JOIKIT VEKITURE. LLG
<br />MLR5 112 RECLAMATION PERMIT M- 2004 -078
<br />13. THE MAXIMUM ALLOWED ENCROAC44MENT OF THE MINE SLOPE TOE
<br />555 WEST HAMPDEKI. SUITE 610
<br />F-K&LEWOOD, GO 80110
<br />LEGEND:
<br />MINING PLAN
<br />FLOODPLAIN INFORMATION:
<br />- -
<br />PERMIT 60UKIDARY
<br />14. THE OPERATOR WILL MIKE THE 51 TE IN SECTION ABOUT 20-25
<br />5A TKO JOINT VENTURE, LLC
<br />- - - -
<br />MIKE EXCAVATION BOUKIDARY
<br />11/9/04
<br />FLOODPLA I M I KIFORMAT I OM 15 FROM
<br />ACRES IM SIZE, AS DEPICTED.
<br />NAME CHANGE PER DMG
<br />TABLE -•
<br />FIRM FLOOD I K15URAKY E RATE MAP.
<br />PAKIEL MO. 08020009856, 08026609816.
<br />1
<br />M I KIE SLOPE TOE
<br />MIMIKI6 PHASE LIMES
<br />15. THE OPERATOR WILL CONSTRUCT PE12I METER BERMS AT 114E
<br />DATED MARCH 18. 1980
<br />pp
<br />DF
<br />5
<br />�'
<br />/24/05
<br />...
<br />100 YR. FLOODPLA I M
<br />DMG ADEQUACY RESPONSE
<br />NOTES:
<br />KF
<br />EXI5TIKI6 WATER
<br />SHALL BE SEEDED WITH THE SPECIFIED SEED MIX IM THE FALL
<br />4 805
<br />- - - -
<br />EXI5TIKI6 7 60KITOUR5
<br />I- AREAS NOT 0I5Tl9215ED BY CAXLRENTT MINTING ACTIVITIES OR 11NDER
<br />OR SPRING.
<br />RECLAMATION WILL BE MAINTAINED A5 FARMLAND, PASTURE OR OTHER
<br />0
<br />EXISTIKI6 POWER POLE
<br />IG. THE OPERATOR SHALL INSTALL I1212I6ATIOkL TREES AKV SHRUBS
<br />SUITABLE COVER CROP UNTIL MIUIKI6 511 IN EACH PHASE.
<br />E
<br />EXI5TIM5 OVERHEAD
<br />2. PRIOR TO COKnTRUGTIOIJ ALL UTILITY. 6A5 WELL, OIL WELL, £ WATER
<br />AS 500M AS IT 15 FEA5IBLE AFTER THE BERM5 HAVE BEEN
<br />POWER
<br />WELL LOCATIONS MUST BE VERIFIED.
<br />6
<br />EXI5TIKI6 6A5 LIKE
<br />GOKISTRUGTED. PLAKTfIM6 FOR t7EGID0005 TREES SHALL OGGlA2
<br />5. INTERNAL MIMING HAUL ROADS TO BE WATERED OKI A REGULAR
<br />SUMP
<br />BASIS TO CONTROL DUST.
<br />PRIOR TO OCTO5ER 15TH AKID AFTER MARC44 15TH. PLAKIFIM6 FOR
<br />GAS MARKER
<br />4. TOPSOIL 4 OVERSUP.AEd WILL BE 5E62E6ATED AND STOCKPILED
<br />©
<br />PETROLEUM WELL
<br />i
<br />AROUND THE PERIMETER OF THE MINIKIG AREA.
<br />TYPICAL - TOPSOIL
<br />STOCKPILE AT EDGE OF
<br />...
<br />GROSS SECTION
<br />GAS /OIL EQUIPMEKIT
<br />!i!
<br />5. TEMPORARY STOCKPILES VARY IN LOCATION AND SIZE INSIDE
<br />U
<br />EAU-+ PHASE.
<br />❑Q
<br />TELEPHOKIE PEDESTAL
<br />6. COK1F I6URAT I ON OF BATG44 PLANTS AKV PROGE551 K1G AREA MAY
<br />X
<br />EX 15T I KJ6 FEK V E
<br />C14AK&E TO COMPLY WIT14 KI0I5E EMISSION RE0UIREMENT5.
<br />EXI5TIK6 TREE
<br />7 COMVEY02/1.1AU_ ROAD WILL EXTEND IKITO EACH PHASE AS MINING
<br />PROGRESSES.
<br />EXISTING STRUCTURES
<br />8. REFER TO EX15TIK16 60KIDITIO1,5 MAP. SHEET 2 OF 7. FOR
<br />STRUCTURE OWKIERSHIP.
<br />O
<br />MINING SEQUFJ.IGE
<br />9. THE TOE OF THE MIKE SLOPE I5 DEF I KIED AS THE COKITAGT OF
<br />®
<br />TOPSOIL BERM
<br />THE MIKIE SLOPE WITH THE TOP OF WEATHERED BEDROCK.
<br />OVER5l1fOEN STOCKPILE
<br />IO.MINE EXCAVATIO LIMIT AND MAXIMUM MINE SLOPE TOE GAM
<br />N
<br />NOT BE EMC420A444ED 5Y EITHER ERO510MAL P206E55E5
<br />ggC]qq
<br />14AUL ROAD /CONVEYOR
<br />(5LOUG44IK)6) OR MIMIKN6.
<br />II. THE MAXIMUM ALLOWED EKIGROACHMEMT OF THE MINE SLOPE TOE
<br />PROPOSED ACCESS
<br />WITH HIGHWAY 85 R.O.W. I5 100 FEET.
<br />APPROXIMATE LOCATION
<br />12. THE MAXIMUM ALLOWED EW_ROAU4MEKIF OF THE MINE SLOPE TOE
<br />Q
<br />OF 6ROLAVWATE92 RECHARGE
<br />WITH THE FULTOM LATERAL OR WCR 27 15 95 FEET
<br />WELLS
<br />LS1 /4 COR.,
<br />SEC.18
<br />I
<br />I
<br />I
<br />I
<br />I
<br />1
<br />i
<br />TEMPORARY TOP501L
<br />STOCXPILE (MATERIAL
<br />TO BE USED TO REUAIM
<br />SCOFFS AS COMG)RREUI
<br />SETBACV DISTAKIGE VARIES REUAMATIOM 15 GOMPLETED)
<br />0.0 5 MINI
<br />SE TI IC
<br />NOT TO SCALE
<br />17, JURISDICTIONAL WETLANDS WILL MOT BE DREDGED OR FILLED
<br />PRIOR TO OBTAINIKI5 A 404 PERMIT FROM THE US ARMY CORPS SCALE: I° =300'
<br />OF EKI6IKLEII _
<br />SEED WITH SPECIFIED
<br />KLATIVE GRASS MIX AND £
<br />WATER TO E5TAB1_15H
<br />IM
<br />II 6RADE
<br />VARIES
<br />TYPICAL - TEMPORARY MINING BERM GROSS SECTION
<br />MOT TO SCALE
<br />CONCEP71JAL PLAN
<br />e
<br />u
<br />II
<br />n
<br />I
<br />I
<br />i
<br />RAW
<br />MATERIALS
<br />IM
<br />PROCESSING PLANT AREA DETAIL
<br />NOTE: NOT TO SCALE
<br />APPROXIMATE
<br />LOCATION OF
<br />RECHARGE
<br />j
<br />PROPOSED
<br />100' ROW
<br />G 1 V I L 2E5OUR6E5, LLC. 15 KIOT 2E5POK151 BLE FOR SAFETY, I M, OKL OR
<br />AE50UT THE PROJECT SITE, K1012 FOR C OMPL I AKJGE ISY THE APPROPRIATE
<br />PARTY OF AKIY RE6ULAT I OKIS THERETO.
<br />THESE MAPS WERE PREPARED BY CIVIL RESOURCES, L-16. I N
<br />COOPERAT I OM WITH 5W TKO JO I KIT VENTURE, L.L6. 5W TKO JOI KIT
<br />VEMTURE, LL6. WILL KEEP THE D I V 151 ON OF M I KIERAL5 AKV C-EOL06Y
<br />INFORMED OF ANY 04AKIISE5 TO THE MIMIKI6 OR RECLAMATIOM PLAKI5
<br />T14ROU1644 AMMUAL REPORTS AMD FILE TECHMIGAL REV151OK15 AK1D
<br />AMEJNI7MEMT APPIAI(� OMS AS KIECESSARY T142OLIC44OUT THE LIFE OF
<br />T14E ,MIME.
<br />DAKIIJfA ORTIZ DATE
<br />CIVIL RESOURCES, L L_6.
<br />LUP70N LAKES RESOURCE,
<br />FT. LUP70N SPECIAL USE PERMIT AND
<br />MLR5 112 RECLAMATION PERMIT M- 2004 -078
<br />13. THE MAXIMUM ALLOWED ENCROAC44MENT OF THE MINE SLOPE TOE
<br />- - - - DRAIKIA6E SWALE
<br />REVISIONS
<br />TO WC42 G. WCR 6.25, AMU WCR 8 15 75 FT.
<br />MINING PLAN
<br />NO,
<br />- -
<br />II 612AM
<br />14. THE OPERATOR WILL MIKE THE 51 TE IN SECTION ABOUT 20-25
<br />5A TKO JOINT VENTURE, LLC
<br />6125OLLMATER
<br />..
<br />REVISIONS PER SW TKO
<br />11/9/04
<br />AR
<br />ACRES IM SIZE, AS DEPICTED.
<br />NAME CHANGE PER DMG
<br />TABLE -•
<br />-...�
<br />1
<br />3
<br />4
<br />15. THE OPERATOR WILL CONSTRUCT PE12I METER BERMS AT 114E
<br />t/27/OS
<br />1/27/05
<br />pp
<br />DF
<br />5
<br />FT LUPTON SPECIAL USE
<br />/24/05
<br />BE6IKIJIKI5 OF EACH RESPECTIVE MIMING PHASE. THE 5E2M5
<br />North
<br />DMG ADEQUACY RESPONSE
<br />\
<br />KF
<br />7
<br />SHALL BE SEEDED WITH THE SPECIFIED SEED MIX IM THE FALL
<br />4 805
<br />KF
<br />OR SPRING.
<br />MINE SLOPE TOE
<br />IG. THE OPERATOR SHALL INSTALL I1212I6ATIOkL TREES AKV SHRUBS
<br />DEWATERIN6 TREMU4,
<br />BOTTOM OF
<br />AS 500M AS IT 15 FEA5IBLE AFTER THE BERM5 HAVE BEEN
<br />POSITIVE DRAIKIA6E TO
<br />6RAVEL RESERVE
<br />GOKISTRUGTED. PLAKTfIM6 FOR t7EGID0005 TREES SHALL OGGlA2
<br />SUMP
<br />PRIOR TO OCTO5ER 15TH AKID AFTER MARC44 15TH. PLAKIFIM6 FOR
<br />O X50' 5017 600'
<br />0
<br />EVERGREEN TREE-5 SHALL OCCUR PRIOR TO OGTO5F_R IST AKV
<br />AFTER MARCH 15TH
<br />TYPICAL - TOPSOIL
<br />STOCKPILE AT EDGE OF
<br />MINING AREAS
<br />GROSS SECTION
<br />NOT TO SCALE
<br />17, JURISDICTIONAL WETLANDS WILL MOT BE DREDGED OR FILLED
<br />PRIOR TO OBTAINIKI5 A 404 PERMIT FROM THE US ARMY CORPS SCALE: I° =300'
<br />OF EKI6IKLEII _
<br />SEED WITH SPECIFIED
<br />KLATIVE GRASS MIX AND £
<br />WATER TO E5TAB1_15H
<br />IM
<br />II 6RADE
<br />VARIES
<br />TYPICAL - TEMPORARY MINING BERM GROSS SECTION
<br />MOT TO SCALE
<br />CONCEP71JAL PLAN
<br />e
<br />u
<br />II
<br />n
<br />I
<br />I
<br />i
<br />RAW
<br />MATERIALS
<br />IM
<br />PROCESSING PLANT AREA DETAIL
<br />NOTE: NOT TO SCALE
<br />APPROXIMATE
<br />LOCATION OF
<br />RECHARGE
<br />j
<br />PROPOSED
<br />100' ROW
<br />G 1 V I L 2E5OUR6E5, LLC. 15 KIOT 2E5POK151 BLE FOR SAFETY, I M, OKL OR
<br />AE50UT THE PROJECT SITE, K1012 FOR C OMPL I AKJGE ISY THE APPROPRIATE
<br />PARTY OF AKIY RE6ULAT I OKIS THERETO.
<br />THESE MAPS WERE PREPARED BY CIVIL RESOURCES, L-16. I N
<br />COOPERAT I OM WITH 5W TKO JO I KIT VENTURE, L.L6. 5W TKO JOI KIT
<br />VEMTURE, LL6. WILL KEEP THE D I V 151 ON OF M I KIERAL5 AKV C-EOL06Y
<br />INFORMED OF ANY 04AKIISE5 TO THE MIMIKI6 OR RECLAMATIOM PLAKI5
<br />T14ROU1644 AMMUAL REPORTS AMD FILE TECHMIGAL REV151OK15 AK1D
<br />AMEJNI7MEMT APPIAI(� OMS AS KIECESSARY T142OLIC44OUT THE LIFE OF
<br />T14E ,MIME.
<br />DAKIIJfA ORTIZ DATE
<br />CIVIL RESOURCES, L L_6.
<br />Permit #:
<br />" .PST C *&_ Confiden[al ?: ti'
<br />Class: Qaj.rn t )
<br />From: 9ti [ TYPe -Seq.:
<br />�
<br />Doc. Name:To: (2YYXC/
<br />Doc. Date (if no date stamp):
<br />4_ll -Lc��S
<br />Copy
<br />LUP70N LAKES RESOURCE,
<br />FT. LUP70N SPECIAL USE PERMIT AND
<br />MLR5 112 RECLAMATION PERMIT M- 2004 -078
<br />REVISIONS
<br />MINING PLAN
<br />NO,
<br />DESCRIPTION
<br />DATE
<br />BY
<br />5A TKO JOINT VENTURE, LLC
<br />1
<br />REVISIONS PER SW TKO
<br />11/9/04
<br />AR
<br />2
<br />NAME CHANGE PER DMG
<br />12/20/04
<br />OF
<br />451 Oak Street, Suite 209
<br />CIVIL R E SIXU R C E S LLC P.O. Box 680 Frederick, CO 80530
<br />303 833 1416 (p) 303 833 2850 (f)
<br />DESIGNED BY: DO NOB NO. DWG:
<br />ARR /SR DATE: SEPT. 2004 ONG- Revised for Adequacy Response 4 -1 -05
<br />DRAWN BY: SCALE: AS NOTED SHEET:
<br />CHECKED BY: DO 5 OF 7
<br />3
<br />4
<br />PERMIT N0. CHANGED
<br />PROCESSING AREA MOVED
<br />t/27/OS
<br />1/27/05
<br />pp
<br />DF
<br />5
<br />FT LUPTON SPECIAL USE
<br />/24/05
<br />SR
<br />6
<br />DMG ADEQUACY RESPONSE
<br />/28/05
<br />KF
<br />7
<br />NAME I SETBACK DIST
<br />4 805
<br />KF
<br />Permit #:
<br />" .PST C *&_ Confiden[al ?: ti'
<br />Class: Qaj.rn t )
<br />From: 9ti [ TYPe -Seq.:
<br />�
<br />Doc. Name:To: (2YYXC/
<br />Doc. Date (if no date stamp):
<br />4_ll -Lc��S
<br />Copy
<br />
|