Laserfiche WebLink
C. Project Descrlptlon. Describe all aspects of the operation: how clesiring will be accomplished, topsoil <br />stockpiled, waste rack placed, tailing disposed of, etc. Calculate production rates and total volumes of waste <br />rock and ore. Include justrfication and calculations for settling pond capacities and sizing of runoff diversion <br />channels. <br />~~ <br />2. For total lifeyt project: <br />(1/ more space is needed fo /ill out a Dlock of in/ormafion, use additional Sheets and attach fo form.) <br />