My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26980
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:46:24 PM
Creation date
11/20/2007 7:23:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Hydrology
Doc Date
12/6/2002
Doc Name
Modification to the CDPS Permit No. CO-0032638
From
The Pittsburg & Midway Coal Mining Co
To
DMG
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r T .~ <br />PARTI <br />• Permit No. CO-0032638 <br />Page No. 16 <br />E. GENERAL MONITORING, SAMPLING AND REPORTING REQUIREMENTS <br />4. Records <br />The pemilttee shall establish and maintain records. Those records shall include the following: <br />a. The date, type, exact location, and time of sampling or measurements; <br />b. The individual(s) who performed the sampling or measurements; <br />c. The date(s) the analyses were performed; <br />d. The individual(s) who performed the analyses; <br />e. The analytical techniques or methods used; <br />£ The results of such analyses; and <br />g. Any other observations, which may result in, an impact on the quality or quantity of the dischazge as indicated in 40 CFR <br />122.44 (1)(1)(ul). <br />The permittee shall retain for a minimum of three (3) years records of all monitoring infomlation, including all original strip <br />chart recordings for continuous monitoring instrumentation, al] calibration and maintenance records, copies of all reports <br />required by this permit and records of all data used to complete the application for this permit. This period of retention shall <br />be extended during the course of any unresolved litigation regarding the dischazge of pollutants by the pennittee or when <br />requested by the Division or EPA. <br />5. Flow Measurin¢ Device <br />If not already a part of the permitted facility, within ninety days after the effective date of the permit, a flow measuring device <br />shall be installed to give representative values of effluent quantities at the respective dischazge points: Unless specifically <br />exempted, or modified in Part I.E.S of this permit, a flow measuring device will be applicable at all designated dischazge <br />points. - - - <br />At the request of the Division, the pemtittee shall show proof of the accuracy of any flow-measuring device used in obtaining <br />data submitted in the monitoring report. The flow-measuring device must indicate values within ten (10) percent of the actual <br />flow being discharged from the facility. <br />6. Signatory and Certification Requirements <br />a. All reports and other information required by the Division, shall be signed and certified for accuracy by the perniittee in <br />accord with the following criteria: <br />i) In the case of corporations, by a principal executive officer of at least the level of vice-president or his or her duly <br />authorized representative, if such representative is responsible for the overall operation of the facility from which the <br />discharge described in the form originates; <br />ii) In the case of a partnership, by a general partner; <br />iii) In the case of a sole proprietorship, by the proprietor; <br />iv) In the case of a municipal, state, or other public facility, by either a principal execufive officer, ranking elected <br />official, or other duly authorized employee. <br />b. All reports required by permits, and other information requested by the Division shall be signed by a person as described <br />above or by a duly authorized representative of that person. A person is a duly authorized representative only if: <br />i) The authorization is made in writing by a person described above; <br />ii) The authorization specifies either an individual or a position having responsibility for the overall operation of the <br />regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, <br />position of equivalent responsibility, or an individual or position having overall responsibility for environmental <br />matters for the company. (A duly authorized representative may thus be either a named individual or any individual <br />occupying a named position); and, <br />
The URL can be used to link to this page
Your browser does not support the video tag.