Laserfiche WebLink
.. <br />History Well '19-2 <br />151 Phase Well Development <br />• Bailing and air-lifting were the methods used to develop Well 19-2. <br />• A total of 621 gallons of water were removed from this well prior to the first <br />sampling event. <br />Sampling <br />• July 12, 1999 water quality sample collected using stainless steel bailer. <br />Sample was sent by overnight carrier and was lost until holding times <br />expired on a number of required constituents. A second sample was <br />collected using a bailer on July 19, 1999. The holding times were met on <br />this sample. The first sample was invalidated as a result of the expired <br />holding time. <br />• August 26, 1999 water quality sample collected using dedicated gas <br />displacement pump. <br />• September 26, 1999 water quality sample collected using gas <br />displacement pump. <br />Notes <br />• This well has a heavy hydrogen sulfide odor upon removal of the well cap. <br />