Laserfiche WebLink
PARTI <br />Page No. 4 <br />Permit No.: CO-0032115 <br />Parameter <br /> 30-Dav Averaee <br />Flow, MGD Report <br />Total Suspended Solids (TSS), mg/1 Report <br />pH, s.u. (minunum-maximum) NA <br />Oil and Grease, mg/1 NA <br />Total Dissolved Solids, nrg/1 Report <br />Whole Toxicity, Acute Toxicity NA <br />Settleable Solids, ail/1 NA <br />Total kon, ugll Report <br />b. Outfalls OOI, 002, 005, 008, 009, OlA, 018 , 022, 024 <br />Limitations <br />Maximum Concentrations <br />7-Dav Averaee <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Daily Maximum <br />Report <br />Report <br />6.5-9.0 <br />10 <br />Report <br />LCso> 100% <br />Report <br />Report <br />PRIMARY LIMITATIONS <br />Parameter Limitations <br /> Maximum Concentrations <br /> 30-Dav Averaee 7-Dav Averaee <br />Flow, MGD Report NA <br />Total Suspended Solids (TSS), mg/t 35 NA <br />pH, s.u. (minimum-maximum) NA NA <br />OI1 and Grease, mg/1 NA NA <br />Total Dissolved Solids, mg/1 Report NA <br />Settleable Solids, rn]/1 NA NA <br />Total Iron, ug/1 3,000 NA <br />Daily Maximum <br />Report <br />70 <br />6.5-9.0 <br />10 <br />Report <br />Report <br />6,000 <br />ALTERNATE LIMITATIONS <br />Any discharge or increase in the volume of a discharge caused by precipitation within any 24-hour period less than or equal to the ] 0- <br />year, 24-hour precinitation event (or snowmelt of equivalent volume) may comply with the following limitations subject to burden of <br />proof requirements described in Par[ LA.2. ~ - <br />Parameter Limitations <br /> Maximum Concentrations <br /> 30-Dav Averaee 7-Dav Averaee Daily Maximum <br />Flow, MGD Report NA Report <br />Total Suspended Solids (TSS), mg/1 Report NA Report <br />pH, s.u. (minimum-maximum) NA NA 6.5-9.0 <br />Oil and Grease, mgll NA NA 10 <br />Total Dissolved Solids, mg/] Report NA Report <br />Settleable Solids, ml/1 NA NA 0.5 <br />Total Iron, ugll Report NA Report <br />Any discharge or increase in volume of a discharge caused by precipitation within any 24-hour period greater than the 10-vear, 24-hour <br />event (or series of storms or snowmelt of equivalent volume) »?aY comply with the following limitations subject to burden of proof <br />requirements described in Part I.A.2. <br />See Part I.C. for Definitions. <br />