Laserfiche WebLink
COLORADO DEPARTMENT OF PUBLIC HEALTHAND ENVIRONMENT, Water Quality Control Division <br />Rationale-Page 10 Permit No. CO-0032115 <br />Table VI-6 -Monitoring Requirements for Outjalls OOl, 001, 005, 008, 009, 014, OIB, 022, 024 <br />Parameter Measuremept Fre'auencv Sainbte Ti <br />Flow, MGD Once per week Instantaneous or t <br />TSS, mgA Once per month Grab <br />pH,, s. u. Once per week In-Situ <br />Oil and Grease, mgA Once per week Visual <br />TDS, mgA Once per quarter Grab <br />Table VI-7-Monitoring Requirements for Outjalls 012, 013, 015, 016 <br />Flaw, MGD cntce per week tnstantaneous or t <br />pH, s.u. Once per week In-Situ <br />Oil and Grease, mgA Once per week Visual <br />Monitoring reguiremenu are based on the previous permit. <br />Additional Monitorinz: As described in section VI.A.I.d.i., a 12-rime analysis for several metals is needed to determine <br />reasonable potential for several outfalls. The following table identifies the outfal[s and metals. The first sampling shalt <br />occur during the first month after the permit becomes effective and sampling shall continue for the next eleven <br />consecutive months, unless discharge does not occur during that first month. Ifno discharge occurs during a month, <br />sampling shall begin (or resume) when discharge resumes and continue until twelve samples have been collected and <br />analyzed using approved methods with method detection Jimits as low or lower than those specked in Part I.E.3. of the <br />permit. If the perminee has a recent data base (1998 or more recent) that includes these parameters for one or mare <br />outfalls, these previous data maybe included as applicable. For example, if the permittee has 8 recent data points for <br />outfa1101 ]for one or more of the specked metals, they can obtain 4 additional data points by sampling monthly after <br />the permit becomes effective, then submit the recent data with the new data. All raw data shall be submitted, not just <br />summaries. <br />Table VI-8 - <br />TR Arsenic X <br />TR Cadmium X <br />Total Tri Chromium X <br />TR Copper X <br />TR Lead X <br />TR Selenium X <br />TR Zinc X <br />C. Reporting <br />1. Discharge Monitorine Report: Trapper Mining, Inc. shall submit Discharge Monitoring Reports (DMRs) on a quarterly <br />basis to the Division. The Division now requires atl permittees to submit DMRs monthly. These reports should contain <br />the required summarization of the test results for parameters shown in Tables VI-S, VI-6, and VI-7 and Part 7.B.1 of the <br />permit. See the permit, Part I.E.I. for details on such submission. <br />2. Additional Reporting: The results of the twelve-time analysis described previously shall be submined as required. <br />3. SS ecia~: Special reports are required in the event of a spill, bypass, or other noncompliance. Please refer to <br />Part I E. of the permit for reporting requirements. As above, submittal of these reports to the US Environmental <br />Protection Agency Region VIII is no longer required. <br />D. Additional Terms and Conditions <br />Last Revised: 4/29/2004 <br />