Laserfiche WebLink
Page 3 of 12 <br />• <br />Permit I.o. CO-DDj~?, <br />E~i'!UENT LIMITATIO!JS ,41JD YONI7CRIIJG REQUIREMENTS (Continued) <br />TITe permittee shall submit to the permit issuing authority in less than lE( <br />dais after the issuance of this permit, a report de~onstratlnc that the <br />achievement of "no discharge" from this facility is not practicable. Tire <br />Grmonstration shall consist o` a cost-effective comparison between estir,„ate <br />costs for attaining "no discharge" ar.d damaees using the fo1lo~+ir.s <br />relationship: 12,000 tons of Total Dissolved Solids is equivalent to <br />S?;D,000,00 damaoes. <br />Ire':: This li«~itatiCn may be r..odified in the future, after sufficient <br />collec:ie-, of c'a:a, tc maintein Hubbard Creek do~:nstrear.T c` the <br />GISC~argi a5 a pO:able Y+o ief Stipp l'+. <br />If, tht report does not adequately deor~onstrate that "no discharge" is not <br />;,racticable, this permit will be revoked follo~•+ing administrative procedure <br />outlines in ~0 CFR 125.22 (a) and 125.36, end state reoulatior.s, as apprcpri <br />The determination of ;he adequacy of the demonstration shall be r.,ade by the <br />Cclerado V:ater Quality Cen;rol Division an,'. [he U.S. Environr,Ten;al Protect <br />,{~tncy. <br />7_19 <br />